My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-096 - Certifying the Environmental Impact Report for the Grand Avenue Street Widening Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2002
>
2002-096 - Certifying the Environmental Impact Report for the Grand Avenue Street Widening Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:29:30 PM
Creation date
6/26/2003 10:47:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2002-096
Date
11/18/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grand Avenue Widening Focused Environmental Impact Report <br />Statement of Overriding Considerations <br /> <br />IMPROVE TRAFFIC FLOW ON GRAND AVENUE <br /> <br />As documented in the Traffic Study for the proposed project and in the EIR, the project <br />segment of Grand Avenue is forecasted to experience poor LOSs without the proposed <br />project. The proposed widening of Grand Avenue will improve the fiow of traffic on this <br />segment of Grand Avenue in the City of Santa Ana, consistent with forecasted traffic <br />demand. Travelers on Grand Avenue, intersecting cross streets and parallel routes will <br />benefit from the improved operating conditions on the project segment of Grand Avenue. <br /> <br />PROVISION OF BIKE LANES <br /> <br />Alternative 2 includes bike lanes on the project segment of Grand Avenue, consistent with <br />the adopted City of Santa Ana Bikeway Master Plan and the Orange County Master Plan <br />of Bikeways. Bicyclists will benefit directly by the provision of this facility. <br /> <br />Alternative 1 does not include bike lanes and, therefore, this benefit would not occur if <br />Alternative 1 is selected for implementation. <br /> <br />CONSISTENCY OF ROAD CROSS SECTIONS <br /> <br />The proposed Grand Avenue widening would provide a cross section on the project <br />segment of Grand Avenue compatible with the existing cross sections on Grand Avenue <br />north and south of the project segment. Consistency of road cress sections on Major <br />Arterials is important for maintaining smooth traffic flows and ensuring that traffic volumes <br />are propedy accommodated on each segment of the read. <br /> <br />CONSISTENCY OF CROSS SECTIONS AT LOCAL INTERSECTIONS <br /> <br />The proposed Grand Avenue widening would provide a cross section on the project <br />segment of Grand Avenue compatible with the existing cress sections at several local <br />intersections with Grand Avenue and the recent improvements on I-5. Consistency of <br />road cross sections on Major Arterials is important for maintaining smooth traffic flows and <br />ensuring that traffic volumes are prepedy accommodated on each segment of the read. <br /> <br />Resolution No, 2002-096 <br /> Page 19 of 19 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.