Laserfiche WebLink
33. <br /> <br />34. <br /> <br />35. <br /> <br />36. <br /> <br />37. <br /> <br />38. <br /> <br />39. <br /> <br />40. <br /> <br />41, <br /> <br />42. <br /> <br />43. <br /> <br />drainage showing the direction and means of flow to the adjacent and/or <br />on/off-site storm drain facility. Include the estimated volumetric flow (Q) in <br />each direction. <br /> <br />Trash separation and recycling programs shall be encouraged on-site to <br />decrease the amount of solid waste that would be generated by the <br />proposed project. <br /> <br />The project shall comply with all requirements identified by the Santa Ana <br />Fire Department. <br /> <br />The applicant shall employ an onsite Deputy Fire Inspector for all required <br />fire inspections during construction. <br /> <br />Emergency access shall be provided to all portions of the site during <br />project construction. <br /> <br />Fire hydrants shall be in operational order during project construction. <br /> <br />The applicant shall provide funding to the Fire Department for provision of <br />a site inspector. Specifically, the applicant shall reimburse the City for <br />eight (8) man-days when the project is granted a certificate of occupancy <br />and annually thereafter. <br /> <br />The applicant shall be required to show to the satisfaction of the Fire <br />Department that the project would not require a fire flow, which exceeds <br />available supplies. <br /> <br />All on-site structures, including the parking structure, shall be fitted with <br />automatic sprinklering systems. In addition, the office towers shall be <br />fitted with elevator recall systems, smoke evacuation systems, fire <br />detection systems, pressurized stairwells, zoned alarm systems, phones <br />in stairwells and elevators and roof water reservoirs with 4,500 gallon. <br /> <br />The applicant shall provide the Fire Department with 150-foot clear access <br />to all site structures. <br /> <br />The applicant shall provide an on-site security system for the office towers <br />and the parking structure that includes alarms and other communication <br />devices. <br /> <br />The applicant must provide a fully detailed security plan for the 10 story <br />high rise which will include: A guard station adjacent to the elevators on <br />the first floor, security guard staffing for the desk and 2 guards for <br />patrolling the parking structure and building, elevator individual floor <br />lockout system, card reader control at the lobby vestibule in the sub- <br />parking garage, and duress system in the parking garage. This security <br /> <br />Resolution No. 2002-099 <br />Page 10 of 16 <br /> <br /> <br />