Laserfiche WebLink
ENCLOSURE1 <br /> <br />November 20, 2002 <br />Invoice No. 7555 <br />PES 2876-01 <br />City of Santa Aha <br />Fire Station No. 7&2 <br />Page I of 2 <br /> <br /> Scope of Additional Work for <br />Santa Aha Fire Stations No. 7 and No. 2 <br /> <br />1.0 <br /> <br />1.2. <br /> <br />The additional work provided for Fire Station No.7 includes the following: <br /> <br />Revise completed plans that showed the Fire Department pre-selected location of the <br />main service switchboard, transfer switch and diesel generator set to northeast comer <br />of property. Plans were revised as a result of change to the initial location selected by <br />Fire Department after the design was already completed. Re-route and size feeder <br />cables from new location for revised mn length and new interconnection <br />requirements. <br /> <br />Revise completed plans including load schedules to add additional receptacles and <br />circuits to Fire Alarm Panel, apparatus room, study and exterior of building. Change <br />was made at direction of Fire Department on final walkthrough but after initial design <br />review. <br /> <br />Provide fire alarm controlled notification light in Study. Revise Fire Alarm <br />notification circuitry/schematic to allow for additional alarm light with controls. Add <br />new contactor to Fire Alarm Panel to provide Fire Alarm initiating contact. Revise <br />plans to consolidate circuitry and provide conduit routing to new light. <br /> <br />Revise completed plans to replace cove lighting in living room, which was removed <br />during initial design, at the direction of the Fire Department. Provide separate <br />independent switching to new living room ceiling lights and re-added cove lights. It <br />was after PES was directed to remove cove lighting that it was determined the cove <br />lighting is used for normal activities and ceiling lights are used for meetings and <br />classes, and both were required. <br /> <br />PES was requested to add ceiling outlets in the canopy for power reels in the canopy <br />area. This required the addition of conduit and wire and revision to the load <br />schedules. <br /> <br />Revise controls for fan in Turnout Room to allow automatic control to door switch <br />"on" and timed "off" with Hand-Off-Auto Switch. This required development of a <br />control schematic, parts list, conduit and wire. <br /> <br /> <br />