My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWER ENGINEERING 1 -2001
Clerk
>
Contracts / Agreements
>
P
>
POWER ENGINEERING 1 -2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 10:00:46 AM
Creation date
6/27/2003 1:34:49 PM
Metadata
Fields
Template:
Contracts
Company Name
Power Engineering services, Inc.
Contract #
Spec 01-042
Agency
Fire
Council Approval Date
6/18/2001
Expiration Date
12/31/2003
Insurance Exp Date
11/5/2003
Destruction Year
2008
Notes
Amended by A-2003-030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BARBARA M. EFFENBERGER, P.E. <br /> <br />President, Civil Engineer <br /> <br />Ms. Barbara Effenberger has over seventeen (17) years of experience in designing, managing and <br />reviewing civil engineering projects and a broad range of project experience including pipeline, petro- <br />chemical, waterfront, commercial, residential, industrial and institutional facility design. Ms. Effenberger <br />is President of Power Engineering Services, Inc. <br /> <br />REGISTRATION <br /> <br />1987 - Civil Engineer, C42558 <br /> <br />PROFESSIONAL EXPERIENCE <br /> <br />Project Engineer, Principal, Power Engineering Services, Inc. <br /> Planning, designing and supervising associates, designers and CAD personnel on <br /> completion of equipment foundations and grading for substations. Perform seismic <br /> evaluation of electrical equipment and structures. Liaison with clients and contractors. <br /> <br />Project Engineer, R/chard K. Shogren & Associates <br /> Third-party Civil/Structural plan check and design review for the County of Santa <br /> Barbara, particularly oil and gas projects including Exxon Santa Ynez Unit Expansion <br /> Project (valuation $1.5 - 1.8 billion), and upgrades and maintenance to Chevron's Point <br /> Arguello plant facilities, Texaco's Gaviota marine Terminal and Unocal's Battles plant <br /> in Santa Maria. Senior Project coordinator for entire Exxon design review effort and <br /> chief liaison to County, Exxon, and Exxon's design consultants. Provide engineering <br /> design review for compliance to codes and standards and engineering support for field <br /> inspection and permit sign-offfor all County submittals. Provide engineering designs and <br /> review for a wide range of civil/structural projects including: CalTrans bridge support at <br /> Crestline, retaining wall in San Dimas, flood controls for the Luz solar plant site at Harper <br /> Lake, and vessel design review at the La Salina Waste Treatment Plant. <br /> <br />Project Engineer, Southern California Gas Company - Structural Facility Design Department <br /> Responsibilities included project management and engineering services to effectively <br /> plan, direct and coordinate major projects which include new and remodeled facilities, <br /> company headquarters and gas processing plants. Directed the activities of contractors, <br /> construction inspectors and architects. Responsible for two headquarter facilities totaling <br /> $22 million and various smaller scale projects totaling $5 million. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.