Laserfiche WebLink
April 20, 2001 <br />PES No. 2876-01 <br />City of Santa Aha Fire Dept. <br /> <br />4.1.3 Brief Description of Representative Work Involving Similar Projects. <br /> <br />Power Engineering Services was asked by Mr. Bob Honish, Fire Marshall for the City of Santa <br />Ana to prepare a proposal including a scope of work for Fire Station No. 2 and Fire Station No. <br />7 electrical upgrade. The Scope of Work developed by PES now appears in Part 3.0 of RFP <br />01-042. Presumably, PES was asked to develop the scope because of our successful <br />completion of Fire Station No. 5 electrical upgrades where PES was the Engineer of Record. <br /> <br />PES demonstrated our competency on the Fire Station No. 5 project with the same team of <br />engineers to be used for this project. The plan check submittal for Fire Station No. 5 was <br />approved by City of Santa Ama Building and Safety Division with no comments or revisions <br />required. <br /> <br />PES has both active and completed projects with very similar requirements to Fire Station No. <br />2 and 7. A small sampling follows: <br /> <br />1. Palm Springs Aerial Tramway - Mountain Station <br /> <br />Prepare plans for electrical system improvements to the Mountain Station to increase <br />the electrical service capacity, improve lighting, provide egress lighting, include <br />emergency power, allow kitchen improvements. <br /> <br />2. Queen Mary, Queen's Seaport Development <br /> <br />Prepare a conceptual study including inventory of ail electrical services (26) to <br />redistribute power to existing and new building as part of development plans. Produce <br />modification plans to existing electric service locations. <br /> <br />3. TA Manufacturing Company - Valencia Facility <br /> <br />Provide complete electrical design package for new grass roots manufacturing facility <br />including office and plant areas. Submit Title 24 calculations ~vith the plancheck <br />package. Prepare plancheck packages for facility upgrades and modifications including <br />new manufacturing lines, lighting, busways, conduits, and emergency generator <br />installation. <br /> <br />4. Master Halco Corporate Offices - La Habra <br /> <br />Provide electrical system design modification plancheck and construction package to <br />add a standby generator, lighting and air conditioning modifications for a Control <br />Dispatch facility. <br /> <br />All of the above projects included a construction estimate and preparation of a major items <br />material list. <br /> <br /> <br />