My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POWER ENGINEERING 1 -2001
Clerk
>
Contracts / Agreements
>
P
>
POWER ENGINEERING 1 -2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 10:00:46 AM
Creation date
6/27/2003 1:34:49 PM
Metadata
Fields
Template:
Contracts
Company Name
Power Engineering services, Inc.
Contract #
Spec 01-042
Agency
Fire
Council Approval Date
6/18/2001
Expiration Date
12/31/2003
Insurance Exp Date
11/5/2003
Destruction Year
2008
Notes
Amended by A-2003-030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 20, 2001 <br />PES No. 2876-01 <br />City of Santa Aha Fire Dept. <br /> <br />4.1.3 Brief Description of Representative Work Involving Similar Projects. <br /> <br />Power Engineering Services was asked by Mr. Bob Honish, Fire Marshall for the City of Santa <br />Ana to prepare a proposal including a scope of work for Fire Station No. 2 and Fire Station No. <br />7 electrical upgrade. The Scope of Work developed by PES now appears in Part 3.0 of RFP <br />01-042. Presumably, PES was asked to develop the scope because of our successful <br />completion of Fire Station No. 5 electrical upgrades where PES was the Engineer of Record. <br /> <br />PES demonstrated our competency on the Fire Station No. 5 project with the same team of <br />engineers to be used for this project. The plan check submittal for Fire Station No. 5 was <br />approved by City of Santa Ama Building and Safety Division with no comments or revisions <br />required. <br /> <br />PES has both active and completed projects with very similar requirements to Fire Station No. <br />2 and 7. A small sampling follows: <br /> <br />1. Palm Springs Aerial Tramway - Mountain Station <br /> <br />Prepare plans for electrical system improvements to the Mountain Station to increase <br />the electrical service capacity, improve lighting, provide egress lighting, include <br />emergency power, allow kitchen improvements. <br /> <br />2. Queen Mary, Queen's Seaport Development <br /> <br />Prepare a conceptual study including inventory of ail electrical services (26) to <br />redistribute power to existing and new building as part of development plans. Produce <br />modification plans to existing electric service locations. <br /> <br />3. TA Manufacturing Company - Valencia Facility <br /> <br />Provide complete electrical design package for new grass roots manufacturing facility <br />including office and plant areas. Submit Title 24 calculations ~vith the plancheck <br />package. Prepare plancheck packages for facility upgrades and modifications including <br />new manufacturing lines, lighting, busways, conduits, and emergency generator <br />installation. <br /> <br />4. Master Halco Corporate Offices - La Habra <br /> <br />Provide electrical system design modification plancheck and construction package to <br />add a standby generator, lighting and air conditioning modifications for a Control <br />Dispatch facility. <br /> <br />All of the above projects included a construction estimate and preparation of a major items <br />material list. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.