Laserfiche WebLink
4.3 <br /> <br />Work Schedule <br />4.3.1 <br /> <br />April 20, 2001 <br />PES No. 2876-01 <br />City of Santa Aha Fire Dept. <br /> <br />PES developed the Scope of Work for this RFP at the request of Mr. Bob Honish. PES <br />worked with Captain Williams on the successful completion of Fire Station No. 5 <br />improvements. PES has considerable experience in scheduling site activities and <br />collecting information necessary for design completion. Our designers and engineers <br />are field oriented and are prepared to pull covers on equipment with the assistance of <br />City personnel to determine existing conditions and develop demolition plans. <br /> <br />Attached on the next page is a proposed schedule for this project. <br /> <br /> <br />