Laserfiche WebLink
WKA <br /> <br /> CiTY OF SANTA ANA <br />SEISMIC RETROFIT OF SANTA ANA BRIDGES <br />McFadden Avenue Bridge <br /> <br />=REUMINARY DESIGN <br /> Review existing m~ a~ drawings I 2l <br /> A~te.d~b..a~d~va.w I 31 01 ~1 ~1 01 01 01 0~ <br /> SubTotal si °l si 41 °l °l ol oI <br />DEVELOPMENT OF SEISMIC ST~TEGY <br /> Geote~ni~r investigation 8 0 2 0 0 0 0 0 <br /> Pe~o~ seismic analysis of exist stratums 5 2~ 1 0 0 80 0 00 00 <br /> Develop retrofit strategies 2 0~ 4 0 0 0 0 0 <br /> " °l "1 °l °l o o o <br /> Attend strategy meeting Sub Total 19 2 20 0 80 0 <br />DEVELOPMENT OF STRUCTU~L PS&E <br /> <br /> P~.p.~.~a~s~e I ~°1si~°1~°1°l °l '°1 ~°1 <br /> S.~To~ad ~0~ ~1 70 ~01 2001 01 1401 10I <br />DESIGN SUPPORT DURING ADVERT SEMENT/CONSTRUCTION <br /> P~pare ~ntra~ ~v[sions a~ ~afifi~tions 2 0 4 0 0 4 1400 100 <br /> Review submi~als and shop dmwings I ~1 °l ~1 1°t 1°1 °l o o <br />Attend meeti~s 6 0 6 0 0 0 0 0 <br />Prepare as-built pla~ J 01 01 ~1 21 2l Si 0 0 <br /> Su~Tota/ ~2 01 ~71 12~ ~21 12 0 0 <br />TOTAL ~BOR 106 14 113 56 292 12 <br /> <br />11 513.00 <br />10 933.00 <br /> 1,446.00 <br /> <br />9 7,617.00 <br /> 614.00 <br /> 824.00 <br /> 10,097.00 <br /> <br />264[ 21,284.00 <br />2781 21,824.00 <br />542 43,108.00 <br /> <br />30 2,548.50 <br />12 1,236.00 <br />13 905.50 <br />65 5,554.00 <br />$ 60,205.00 <br /> <br />OTHER DIRECT COST <br />PRINTINGS AND REPRODUCTION Numbers UnitCost <br />22 x34blues 350.00 <br /> <br />22 x 34 mylars <br /> <br />11 x 17 shts <br /> <br />8112x 11 shts <br /> <br />MILEAGE REIMBUS. <br />Travel Miles <br /> <br />Air - Orange <br />Rental Cars <br /> <br />CAD <br /> <br /> CAD Station <br /> Plotting Services <br />MAIL/DELIVERY <br /> <br />Ovemi.~ht Mails <br />Special Deliveries <br /> <br />SUBCONSULTANT <br /> <br />14(~ <br /> 2fi <br /> <br /> 420 <br />1100 <br /> <br /> 100 <br />0.75 <br />0.75 <br /> <br /> 2.5 <br /> 25 <br />0.75 <br />0.15 <br /> <br />0.35 <br />35fi <br /> 50 <br /> <br />25 <br /> <br />6 40 <br /> <br />500.00 :i.;' <br />315.00 ~'' "': <br />165.00 <br /> <br /> 35.00 ~,'~ <br />262.50 <br /> <br />37.50 <br /> <br />100.00 <br /> <br /> EMI- Geotechnical 18,045.00 <br /> RBF- 23,339.89 <br />TOTAL ODC COST $ 43,389.89 <br /> <br />TOTAL PROPOSED FEE $ 103,594.89 <br /> <br /> <br />