Laserfiche WebLink
First-wka <br /> <br />WKA <br /> <br /> CITY OF SANTA ANA <br />SEISMIC RETROFIT OF SANTA ANA BRIDGES <br />Fimt Street Bridge <br /> <br />Classification <br /> <br />Houdy Rates <br /> <br />PRELIMINARY DESIGN <br /> Review existing record and drawings <br /> Attend the field review <br /> <br />DEVELOPMENT OF SEISMIC STRATEGY <br /> Gectechnical investigation <br /> Perform seismic analysis of exist structures <br /> <br />Develop retrofit strategies <br />Attend strategy meeting <br /> <br />105.00 <br /> <br />210.00 <br />315.00 <br /> <br />420.0( <br /> <br /> 210.00 <br /> 420.00 <br /> 315.00 <br />1,365.00 <br /> <br />DEVELOPMENT OF STRUCTURAL PS&E <br /> Complete seismic retrofit design (ind.check)I 61 41 01 01 1401 01 01 01 150 11,324.00 <br /> Prepare <br /> structural <br /> PS&E <br /> (plan <br /> review) <br /> I 21 °l °l °l 4°1 °l °l oj 14202 <br /> 3,150.00 <br /> SubTotalJ 81 4J 0 0J 1801 01 01 01 14,474.00 <br />DESIGN SUPPORT DUR NG ADVERT SEMENT/CONSTRUCTION <br /> Prepare contract revisions and clarifications J 2J 0J 0J 0J 01 01 0J 0J 2 210.00 <br /> Review submittals and shop drawings J 41 0J 4J 01 0J 0J 0J 0J i 824.00 <br /> Attend meetings J 3J oJ oJ oJ oJ oJ oJ oJ 315.00 <br /> Prepare as-built plans J l J OJ OJ OJ OJ OJ OJ OJ 105.00 <br /> SubTotal 10 0 4J 01 01 01 0 01 141 1,454.00 <br />TOTAL LABOR 34 4 4 0 180 0 0 0 222r $ 17,608.00 <br /> <br />DTHER DIRECT COST <br /> PRINTINGSANDREPRODUCTION I i%.J:l-it.?s ; IJ:'ilCD.;I I <br /> <br /> 22 x 34 mylars '~ ~'1 25 - 2'30 03 <br /> 8112 x 11 shts .2 ..... 1.4 -- -- <br /> <br /> MILEAGE REIMBUS. <br /> Travel Miles I(,(, C. 35 -" 35 <br /> Air - Orange 0 75, <br /> Rental Cars J ' ~ ,w'~.~; ~.--~. <br /> <br />CAD <br /> <br />CAD Station <br /> <br />Plotting Services <br />MAIL/DELIVERY <br /> <br />Overnight Mails <br />Special Deliveries <br /> <br />SUBCONSULTANT <br />EMI- Geotechnical <br /> <br />RBF- <br /> <br />100.0':? <br /> <br />240.C,0 <br /> <br />$ 87,316.35 <br /> <br />TOTAL CDC COST <br /> <br /> TOTAL PROPOSED FEE $ 104,924.35 <br /> <br />Page 8 <br /> <br /> <br />