Laserfiche WebLink
W. KOO AND ASSOCIATES <br /> OTHER DIRECT COSTS <br /> <br />Page 4 <br /> <br />PROJECT: <br />CLIENT: <br /> <br />Fairview Avenue Bridge over Santa Ana Rive~ <br />Seismic Retrofit Strategy Verification <br /> <br />City of Santa Ana <br /> <br />ITEMS BASIS UNIT AMNT. COST <br /> <br />(1) PRINTINGS/REPRODUCTIONS <br />Number of drawings 10 EA <br />Size of Drawings 5.5 SF <br /> <br /> No. of Sets <br /> Bluelines (24x36)-- 20 SF 1100 <br /> Sepia Transp= 0 SF 0 <br /> Mylars= 0 SF 0 <br /> Vellums= 5 SF 275 <br /> Photo development 0 Prints 0 <br /> TOTAL (1) <br />12) COPYINGIBINDING <br />Calculations 1200 Sht 1200 <br />Reports 500 Sht 500 <br />Color copy (letter size) 0 Shts <br />Xerox (letter size)= 0 Shts 0 <br />Xerox (11X17)= 120 Shts 1200, <br />Specifications 0 Sht 0 <br /> TOTAL (2) <br />[3) COMPUTER/CADD <br />CAD Oper. @ 0 Hrs, 0 <br />CPU Time @ 0 Min. 0.00 <br />Plottings 0 EA 0.00 <br /> TOTAL (3) <br />[4) TRAVE~RANSPoRTATioN <br /> <br />CONTRACT NO. <br /> <br />TOTAL <br /> <br />0.13 14~ <br />0.25 <br />4.50 <br />1.20 330 <br />0.35 0 <br /> 473 <br /> <br />0.08 96 <br />0.08 40 <br />1.75 0 <br />0.09 0 <br />0.35 420 <br />0.08 0 <br /> 556 <br /> <br />0.00 0 <br />0.00 0 <br />2.85 0 <br /> 0 <br /> <br />Total Trip Reimburbsement <br /> <br /> TOTAL (4) <br />~uBcoNSU L-~N'F~ <br /> <br />Earth Mechanics Inc. 11980 <br /> <br /> TOTAL (5) <br />[6) SPECIAL DELivERiES <br /> <br />US Mails <br />FedEx(orEq) <br />SpecialDel. <br /> TOTAL(6) <br /> <br />Per Trip 2 <br />Days 0i <br />Days 0: <br />Miles 0 <br /> <br />LS <br />LS <br />LS <br /> <br />450 <br /> <br />0 EA 1.00 0.45 <br />8 EA 1.00 25 <br />3 EA 1.00 40 <br /> <br />9O0 <br /> 0 <br /> 0 <br /> 0 <br />900 <br /> <br /> 0 <br />11980 <br /> 0 <br /> 0 <br />11980 <br /> <br /> 0 <br />2OO <br />120 <br />320 <br /> <br /> <br />