Laserfiche WebLink
07:30 FRO~RBF CONSULTINg-PLaNING DEPT. +94983741ZZ T-?Of' P.005/006 F-?Z? <br /> Santa Ar~a RNer Bridges <br /> <br />N,.OTES: <br /> <br />Budget Item. These items have designated fee amounts as budget only. Should this budget amount be <br />exceeded, the client shall be notified for authorization and additional work shall proceed on a time and material <br />basis. Deviations el' modifications from the original proposal or attached scope of work wilt resul;[ in potenUal <br />re-evaluation of the associated design fees. items not specifi .cally requested in the proposal will be considered <br />an additional work item. <br /> <br />Exclusions - Any work relating to the following items are specifically excluded from the services described <br />herein. Should these services be required, they may be under[aken by the consul[ant under separate <br />addendum. <br /> <br />4. <br />5. <br />6, <br />7. <br />8. <br />9. <br /> <br />Soils Engineering and geotechnical report <br />Environmental Impact Report, Environmental Impact Statement, Environmental Assessment, Initial <br />Study Prepacation <br />Aerial topography 0~' photography <br />Utility relocation plans <br />Legal descriptions and exhibits <br />Application Fees <br />Mitigation Plan <br />SecUon 7 Consultation with the USFWS <br />Meetings beyond these specified above <br /> <br /> Page 6 .of B . <br />November 19, 2002 RBF CONSULTING <br /> <br /> <br />