My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-2003-088
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY SANITATION DISTRICT
>
A-2003-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:32:31 PM
Creation date
7/15/2003 11:02:17 AM
Metadata
Fields
Template:
Contracts
Company Name
Orange County Sanitation District
Contract #
A-2003-088
Agency
Public Works
Council Approval Date
5/5/2003
Expiration Date
5/2/2005
Destruction Year
2010
Notes
Cooperative Projects Program Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP 4 <br /> <br />METERING WITH COMMODITY RATES FOR ALL NEW CONNECTIONS <br />AND RETROFIT OF EXISTING CONNECTIONS <br /> <br />Requirements for Documenting BMP Implementation <br /> <br /> a) Confirmation that all new connections are metered and are being billed by volume of <br /> <br /> use, <br /> <br /> b) Number ofunmetered accounts in the service area. For the purposes of evaluation. <br /> this shall be defined as the baseline meter retrofit target, and shall be used to calculate <br /> the agencies minimum annual retrofit requirement. <br /> <br /> c) Number ofunmetered connections retrofitted during the reporting period. <br /> <br /> d) Number of CII accounts with mixed-use meters. <br /> <br /> e) Number of CII accounts with mixed-use meters retrofitted with dedicated irrigation <br /> meters during repotting period. <br /> <br />Criteria to Determine BMP Implementation Status <br /> <br />a) Agency with existing unmetered connections has completed a meter retrofit plan by <br /> end of first reporting period following the date implementation was to commence. <br /> <br />b) Agency has completed a feasibility study examining incentive programs to move <br /> landscape water uses on mixed-use meters to dedicated landscape meters by end of <br /> flint reporting period fol!owing the date implementation was to commence. <br /> <br />c) Agency with existing urunetered connections is on track to meter these connections <br /> within 10 years of the date implementation was to commence. An agency wilt be <br /> considered on track if the percent of metered accounts retrofitted with meters <br /> equals or exceeds the following: 10% by end of first reporting period following date <br /> implementation to commence: 24% by end of second reporting period; 42% by end of <br /> third reporting period; 64% by end of fourth reporting period; and 90% by end of fifth <br /> reporting period. <br /> <br />Water Savinqs Assumptions <br /> <br /> Assume meter retrofits will result in a 20% reduction in demand by retrofitted accounts. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.