My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2522
Clerk
>
Ordinances
>
2000 - 2010 (NS-2416-2812)
>
2003 (NS-2520 - NS-2640)
>
NS-2522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 1:01:37 PM
Creation date
7/21/2003 2:22:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Doc #
NS-2522
Date
2/3/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Building Official may issue a permit for the construction of part of an <br />electrical system before the entire plans and specifications for the whole system have <br />been submitted or approved, provided adequate information and detailed statements <br />have been filed complying with all pertinent requirements of this code. The holders of <br />such permits shall proceed at their own risk without assurance that the permit for the <br />entire building, structure, or building service will be granted. <br /> <br /> (b) Retention of plans. One set of approved plans, specifications, and <br />computations shall be retained by the Building Official until final approval of the work <br />covered therein. One set of approved plans and specifications shall be returned to the <br />applicant and shall be kept on the site of the building or work at all times during which <br />the work authorized thereby is in progress. <br /> <br /> SECTION 52: That section 8-689 is added to Chapter 8 of the Santa Ana <br />Municipal Code to read in full as follows: <br /> <br />Sec. 8-689. Permit fees. <br /> <br /> The fee for each electrical permit shall be as set forth in the Miscellaneous Fee <br />Resolution of the City of Santa Aha. <br /> <br /> SECTION 53: That section 8-690 is added to Chapter 8 of the Santa Ana <br />Municipal Code to read in full as follows: <br /> <br />Sec. 8-690. Inspections <br /> <br /> (a) General. All electrical systems and equipment for which a permit is required <br />by this code shall be subject to inspection by the Building Official, and the electrical <br />system shall remain accessible and exposed for inspection purposes until approved by <br />the Building Official. <br /> <br /> It shall be the duty of the permit applicant to cause the electrical system to <br />remain accessible and exposed for inspection purposes. Neither the Building Official <br />nor the jurisdiction shall be liable for the expense entailed in the removal or <br />replacement of any material required to permit inspection. When the installation of an <br />electrical system and equipment is complete, an additional and final inspection shall be <br />made. Electrical systems and equipment regulated by this code shall not be connected <br />to the energy source until authorized by the Building Official. <br /> <br /> Approval as a result of an inspection shall not be construed to be an approval of <br />a violation of the provisions of this code or of other ordinances of the jurisdiction. <br />Inspections presuming to give authority to violate or cancel provisions of this code or of <br />other ordinances of the jurisdiction shall not be valid. <br /> <br />Ordinance No. NS-2522 <br />Page 28 of 47 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.