Laserfiche WebLink
Transportation Enhancement Activities (TEA) Application Form <br />.PART ONE: GENERAL PROJECT INFORMATION <br /> <br /> Project is located entirely within the RTPA~ <br />__ Proposal is statewide or multi-regional in scope. <br />PROJECT TITLE: <br />Art Panels Project---Santa Ant Tratn Station <br /> <br />RTPA/County: OCTA/Orange Couhty <br />Legislative Distdct Number. <br /> <br />ADMINISTERING AGENCY APPLICANT Project <br />Administrator/person with day-to-day responsibilit7 for <br />implementing project (Name, title, agency, address, phone, fax, small) <br /> <br />Dave Biondolillo, Transportation Analyst <br />City of Santa Ant, 20 Civic Center Plaza, M-93 <br />Post Office Box 1988 <br />Santa Ana, California 92702 <br />(714) 647-5603 (714)647-5823 FAX <br />dbiondolitlo~ci.sa nta-a na.ca, us <br /> <br />TEA FUNDS REQUESTED $375.000 <br />NON-FEDERAL TEA MATCH $125.000 <br />TOTAL TEA PROJECT COST $500.000 <br /> [] TEA is a stand-alone project. <br /> [] TEA is part of a larger project. <br />Total Project Cost $500.000 <br />Round dollars to nearest thousands) <br /> <br />Person who can answer questions about this <br />application (Name, title, phone, fax, email) <br /> <br />PARTNER(S) (Name, title, agency, address, phone, fax) <br /> <br />Brian Fansler, Rail Transportation Associate <br />CA. Dept. of Transportation, Division of Rail <br />(916) 653-0754, (916) 653-4565 FAX <br />B rian,Fa nsler(~dot, ca.~lOV <br /> <br />PROJECT SCOPE OF PROPOSED TRANSPORTATION ENHANCEMENT ACTIVITIES <br />Describe the project's location, limits of work, size, etc. (Not the justification or benefits). <br /> <br />The proposed project is located at 1000 East Santa Ana Boulevard at the Santa Aha Regional Transportation Center (SARTC) <br />in the City of Santa Aha. The project entails the installation of color imprinted art panels onto a cinderblock wall similar to a <br />Caltrans soundwall. The cinderblock wall has a two fold function: 1) to shield the Orange County maintenance facility from the <br />view of travelers using the SARTC; and, 2) function as a backdrop upon which art panels will be mounted. The wall would be <br />1,000 feet long by 10 feet high and be constructed adjacent to the existing railroad tracks just east of the SARTC railroad <br />platform. The art images imprinted on the panels would be created by students or Orange County artist selected by an art or <br />aesthetics advisory committee. <br /> <br />PROPOSED SCHEDULE: <br />Start Environmental Studies <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates complete <br />Start Right of Way Acquisition <br />Right of Way Certification <br />Ready to Advertise ~' <br />Award Construction <br />Project Completion-(open for use) <br /> <br />Quarter and Calendar Year <br />Complete <br />Complete <br />Complete <br />March 24, 2003 <br />October 17, 2003 <br />N/A <br />N/A <br />October 19, 2003 <br />December 1, 2003 <br />May 2004 <br /> <br />WHICH CATEGORY OR CATEGORIES ENCOMPASS THE TEA? (May be more than one.) <br />List approximate amount of federal TEA funds to be spent in each of the TEA categories: <br /> <br />$375,000 <br /> <br />l~.'~edestrian or bike facilities $. <br />2..~,cquisition of sites $. <br />3. Historic highway programs $. <br />4. Landscaping/scenic beautification $. <br />5. Historic preservation $. <br />6. Historic transportation rehabilitation $. <br /> <br />7, Rails to trails <br /> <br />8. Outdoor advertising removal <br /> <br />9. Archaeology planning/researeh <br /> <br />10. Runoffwater pollution control <br /> <br />11. Environmental mitigation <br /> <br />12. Transportation museums establishment <br /> <br />Activities outside the categories: List approximate amount of federal TEA funds to be spent in activities outside the twelve categories <br />(must be ne.cessary and incidental to the portion inside the categories): $ <br />Describe: . · <br /> <br /> <br />