My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MERCY HOUSE CENTER 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
M-N (INACTIVE)
>
MERCY HOUSE CENTER 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 1:02:22 PM
Creation date
8/20/2003 3:12:16 PM
Metadata
Fields
Template:
Contracts
Company Name
Mercy House Center
Contract #
A-2003-056
Agency
Community Development
Council Approval Date
4/7/2003
Expiration Date
6/30/2004
Insurance Exp Date
5/2/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ing units includes, without limitation: notification, evaluation by visual assessment, paint stabi- <br />lization utilizing safe work practices, and clearance. <br />(2) CITY advises SUBRECIPIENT that in the event the <br />services provided hereunder include rental assistance payments, such as first and last month's <br />rent and/or security deposit, and the assisted tenant executes a lease for long term occupancy, in- <br />cluding occupancy in the same dwelling unit for more than 100 days, then the provisions of Sub- <br />part M (Tenant Based Rental Assistance), will apply (unless otherwise informed and directed by <br />HUD). hi this regard, CITY advises SUBRECIPIENT that Subpart M requires HQS inspection <br />of each dwelling unit prior to occupancy and prior to compliance with applicable notification, <br />evaluation by visual assessment, reduction through paint stabilization utilizing safe work prac- <br />tices, and clearance requirements of the LBP REGS. <br />(e) Lead Hazard Reduction Work. SUBRECIPIENT shall cause LBP hazard <br />reduction, such as paint stabilization, interim controls, standard treatments, or abatement of all <br />residential property that is under its ownership, possession, or control and/or residential property <br />occupied by persons or families that receive financial or other assistance from SUBRECIPIENT, <br />except as exempted as described in subsection 4(d)(i)(1) above. <br />(1) If paint stabilization occurs, SUBRECIPIENT shall cause paint stabi- <br />lization of each deteriorated surface and clearance of residential units pursuant to Section <br />35.1330(a) and (b) shall occur before occupancy of a vacant dwelling unit, or where a unit is <br />occupied, immediately after receipt of the ESG FUNDS hereunder. <br />(2) Safe Work Practices shall be used in all LBP hazard reduction work. <br />(3) Clearance shall be conducted to confirm that no LBP hazards remain <br />when LBP hazard reduction work is complete. Confirmation of clearance by written certification <br />of a qualified inspector is required on an annual basis in connection with submittal of the April <br />15 quarterly report. <br />(f) Ongoing Maintenance. SUBRECIPIENT shall incorporate ongoing LBP <br />maintenance activities into regular building operations in accordance with Section 35.1355(a) for <br />all residential property that is under its ownership, possession, or control and/or residential prop- <br />erty occupied by persons or families that receive financial or other assistance from <br />SUBRECIPIENT, except as exempted as described in subsection 4(d)(i)(1) above. <br />(1) Ongoing maintenance includes confirmation of clearance which shall <br />be conducted to confirm that no LBP hazards remain when LBP hazard reduction work is com- <br />plete. <br />(2) Ongoing maintenance also includes confirmation of clearance by writ- <br />ten certification of a qualified inspector on an annual basis in connection with submittal of the <br />April 15 quarterly report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.