My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DOTY BROTHERS CONSTRUCTION COMPANY 1
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
DOTY BROTHERS CONSTRUCTION COMPANY 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 3:00:36 PM
Creation date
9/4/2003 11:12:44 AM
Metadata
Fields
Template:
Contracts
Company Name
Doty Bros. Construction Co.
Contract #
A-2003-175
Agency
Public Works
Council Approval Date
8/4/2003
Expiration Date
6/30/2006
Insurance Exp Date
10/11/2008
Destruction Year
2018
Notes
AMENDED BY A-2006-179
Document Relationships
DOTY BROTHERS CONSTRUCTION COMPANY 1A
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />DOTY <br />BROS. <br />Construction <br />Company <br />w I-i�Co- <br />COST <br />PLUS RATES <br />SOUTHERN CALIFORNIA <br />COST PLUS <br />RATES EFFECTIVE JULY 1, 2004 TO JANUARY 30,2005 <br />PAY <br />STRAIGHT <br />OVER DOUBLE <br />PAY <br />STRAIGHT <br />OVER <br />DOUBLE <br />CRAFTSMAWCLASS <br />CODE <br />TIME <br />TIME TIME <br />CRAFTSMAN/CLASS <br />CODE <br />TIME <br />TIME <br />TIME <br />CARPENTERS <br />OPERATING ENGINEERS <br />General Foreman <br />CGF <br />68.91 <br />97.50 126.09 <br />General Foreman, Appdx. A <br />OGF <br />76.40 <br />105.16 <br />133.93 <br />Foreman <br />CFM <br />65.57 <br />92.50 119.42 <br />Foreman, Appdx. A <br />OFM <br />73.89 <br />101.41 <br />128.92 <br />Journeyman <br />CJM <br />62.24 <br />87.49 112.75 <br />Group 1, Appdx. A - Oiler <br />OG1 <br />66.57 <br />90.42 <br />114.28 <br />Shingler <br />CSJ <br />62.46 <br />87.82 113.18 <br />Group 2, Appdx. A - Oiler <br />OG2 <br />67.87 <br />92.38 <br />116.88 <br />Apprentice - 8th Period (90%) <br />CA8 <br />57.18 <br />79.91 102.64 <br />Group 8, Appdx. A - Universal <br />OG8 <br />71.39 <br />97.65 <br />123.92 <br />Group 10, Appdx. A - Mechanic <br />OGA <br />71.59 <br />97.96 <br />124.32 <br />Group 8, Appdx. B - Crane > 25 Tons <br />OB8 <br />71.88 <br />98.38 <br />124.89 <br />Group 9, Appdx. B - Crane < 25 Tans <br />OB9 <br />72.16 <br />98.81 <br />125.45 <br />MILLWRIGHTS <br />98.75 127.76 <br />Apprentice, Grp 8, Appdx A - Step 6 (90%) <br />OA6 <br />66.25 <br />89.94 <br />113.63 <br />General Foreman <br />CMG <br />69.74 <br />Foreman <br />CMF <br />66.41 <br />93.75 121.09 <br />Journeyman <br />CMJ <br />63.07 <br />88.74 114.41 <br />Apprentice - 8th Period (95%) <br />CM8 <br />60.50 <br />84.89 109.28 <br />U.A. PIPEFITTERS/WELDERS <br />INDUSTRIAL <br />General Foreman <br />IGF <br />79.66 <br />112.15 <br />141.74 <br />CEMENTMASONS <br />Foreman <br />IFM <br />74.61 <br />104.57 <br />131.79 <br />Foreman <br />MFM <br />62.59 <br />84.03 105.46 <br />Journeyman - Welder/Fitter <br />IJM <br />66.98 <br />93.14 <br />116.81 <br />Journeyman <br />MJM <br />60.09 <br />80.27 100.46 <br />Apprentice - Fifth Year <br />IA5 <br />53.94 <br />75.20 <br />94.57 <br />F&T Machine Operator <br />MTO <br />60.51 <br />80.90 101.29 <br />Apprentice - 8th 6 Mos. (90%) <br />MAS <br />56.06 <br />74.22 92.38 <br />SHORTLINE (LOCAL 250) <br />Foreman <br />SFM <br />78.27 <br />110.23 <br />139.38 <br />Journeyman(Welder/Fitter) <br />SJM <br />72.80 <br />102.02 <br />128.52 <br />LABORERS <br />Welder Helper <br />SWH <br />41.92 <br />57.82 <br />72.67 <br />General Foreman <br />LGF <br />58.98 <br />80.45 101.93 <br />Pre -Helper <br />SPH <br />24.67 <br />34.41 <br />44.15 <br />Foreman <br />LFM <br />57.31 <br />77.95 98.59 <br />Group 1 - General <br />LG1 <br />50.39 <br />67.57 84.75 <br />INSIDE WIREMEN <br />Group 2 - Wrapper> 6" <br />LG2 <br />51.31 <br />68.94 86.58 <br />General Foreman <br />EGF <br />86.03 <br />121.04 <br />156.05 <br />Group 3 - PTO/Wrapper < 6" <br />LG3 <br />52.22 <br />70.32 88.42 <br />Foreman <br />EFM <br />76.47 <br />106.70 <br />136.93 <br />Group 4 - Pipe layer, C&S <br />LG4 <br />54.81 <br />74.20 93.59 <br />Journeyman <br />EJM <br />70.33 <br />97.49 <br />124.64 <br />Group 5 - Blaster <br />LG5 <br />55.39 <br />75.07 94.76 <br />Apprentice - 10th Period (85%) <br />EAO <br />61.00 <br />84.08 <br />107.16 <br />Apprentice - 6th Period (85%) <br />LA6 <br />41.85 <br />58.58 75.31 <br />UTILITY <br />Foreman <br />UFM <br />60.42 <br />84.77 <br />107.86 <br />UWJ <br />5417 <br />7539 <br />9535 <br />TEAMSTERS Welder <br />General Foreman TGF 62.16 83.97 105.78 Journeyman/Fuser UFJ 45.53 62.43 78.49 <br />Foreman TFM 60.50 81.47 102.45 Pipe Tradesman II UP2 33.29 44.32 54.32 <br />Group 2 - 2 Axle TG2 57.56 77.07 96.57 <br />Group 3 - 3 Axle TG3 57.78 77.39 97.01 PROJECT MANAGEMENT <br />Group 5 - Working Truck Driver TG5 57.99 77.72 97.44 Project Manager MPM 91.40 124.30 160.35 <br />Group 6 - 4 or More Axle TG6 58.19 78.02 97.84 Superintendent MSP 79.48 108.09 139.44 <br />Group 9 - Lo -Bed TG9 59.36 79.77 100.18 Project Engineer MPE 63.58 92.77 121.96 <br />Subjourneyman - 4001-6000 Hrs. TA3 42.90 55.82 68.75 <br />Apprentice Rates: Apprentice rates as listed above are the highest classification prior to journeyman full scale rates. Billing rate for Apprentice will be based on <br />actual classification. <br />Subsistence: Superintendent - $50.00/Day, General Foreman - $40.00/Day, All other crafts per applicable Union Agreements or negotiated rates <br />Travel Time: Customer will be advised if travel time is applicable <br />Overtime Rates: All hours outside regularly constituted shift shall be time and one half. Sundays and holidays shall be paid at double time. For Operating Engineers <br />first four (4) hours outside regular shift, and first twelve (12) hours on Saturday is time and one half; all additional hours at double time except holidays which are at <br />triple time. <br />Markup: Material, subcontractors, subsistence, and outside rentals (including fuel costs), will be billed cost plus sales tax where applicable, plus mark-up of 15% <br />Boundaries of Southern California Cost Plus Rates: consists of the eleven It 1) counties of Los Angeles, Inyo, Mono, Orange, Riverside, San Bernardino, Imperial, <br />Ventura, Santa Barbara, San Luis Obispo, Kern and in addition: Richardson Rock, Santa Cruz Island, Arch Rock, San Nicholas Island, Catalina Island, San Clemente <br />Island, San Miguel Island, Santa Barbara Island, Santa Rosa Island, Anacapa Island, including the Channel Islands Monument. Rale Scale does not include San <br />Diego County. <br />NOTE: Wage scales are in accordance with Associated General Contractors Master Labor Agreement, and are subject to change without notice. This rate <br />sheet is not all inclusive; additional classifications available if required CA C.L. 273024 <br />11232 E. Firestone Blvd., Norwalk, CA 90650 Phone: (562) 864-6566 Fax: (562) 864-6052 www.dotybros.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.