My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Paulus Engineering 1
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
Paulus Engineering 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:48:36 PM
Creation date
9/25/2003 1:12:58 PM
Metadata
Fields
Template:
Contracts
Company Name
Paulus Engineering, Inc.
Contract #
A-2003-175A
Agency
Public Works
Council Approval Date
8/4/2003
Insurance Exp Date
5/1/2007
Destruction Year
2018
Notes
Amended by A-2006-180
Document Relationships
Paulus Engineering 1a
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSURA14CE ON FILE <br />WORK MAY PROCEED <br />U�LNICR o f SPIRES <br />CLERK OF COUNCIL <br />DATE: io- 9-02 <br />ON -CALL AGREEMENT <br />A-2003-175A <br />THIS AGREEMENT, made and entered into this 4''day of August 2003, by <br />and between PAULUS ENGINEERING, INC., a California corporation), (hereinafter <br />"Contractor"), and the City of Santa Ana, a charter city and municipal corporation organized <br />and existing under the Constitution and laws of the State of California (hereinafter "City"). <br />RECITALS <br />A. The City of Santa Ana's Public Works Agency Water Resources (CITY), <br />provides water and sewer services to persons and property located both within and <br />beyond the boundaries of CITY. <br />B. From time to time CITY requires the services of independent contractors to assist <br />CITY in natural or manmade emergency situations when CITY has an insufficient <br />number of personnel and/or insufficient materials and/or equipment required to <br />take action necessary on an expedited basis to prevent a system outage, to <br />expeditiously restore service to normal operating conditions and/or to maintain <br />service during such emergencies. <br />C. CITY desires to expedite securing services of contractors to provide personnel, <br />materials, tools, and/or equipment to assist CITY during such emergencies <br />(collectively, Services). <br />D. Contractor represents that Contractor is able and willing to provide such services the <br />City. <br />E. In undertaking the performance of this Agreement, Contractor represents that it is <br />knowledgeable in its field and that any services performed by Contractor under this <br />Agreement will be performed in compliance with such standards as may reasonably <br />be expected from a professional consulting firm in the field. <br />F. The public interest, welfare and economy will be served by this Agreement <br />NOW THEREFORE, in consideration of the mutual and respective promises, and subject to <br />the terms and conditions hereinafter set forth, the parties agree as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.