Laserfiche WebLink
I~ <br />City of Santa Ana AIMS <br />Estimated Project Personnel and Staffing Costs <br />Work Description Hours Hourly <br />Rate Labor <br />Cost Labor+ OH <br />Costs Total Cost <br />Incl Fee <br />Pro)ect Management: 355 $16,881 $42,709 $46,879 <br />Technical Support 140 $38.46 $5,384 $13,623 $14,985 <br />Project Management 215 $53.47 $11,496 $29,086 $31,995 <br />System Engineering: 501 $18,270 $46,223 $50,846 <br />System Design (Engineering) 115 $46.57 $5,355 $13,548 $14,903 <br />Hardware Configuration (Central System) 96 $30.34 $2,912 $7,368 $8,105 <br />Hardware Configuration (VME Boards) 32 $47.88 $1,532 $3,876 $4,264 <br />Database for 14 intersections 42 $ 28.82 $1,210 $3,062 $3,369 <br />Graphics for 14 intersections 56 $25.39 $1,422 $3,597 $3,957 <br />Post Delivery Support 80 $ 34.72 $2,777 $7,026 $7,729 <br />On-Site System Delivery 80 $ 38.27 $3,061 $7,745 $8,520 <br />Adaptive System: 424 $17,981 $45,492 $50,040 <br />System Integration and Testing 80 $47.88 $3,830 $9,691 $10,660 <br />Saturation Data Flow and Field Survey 93 $22.93 $2,132 $5,395 $5,935 <br />OPAC Calibration & Fine Tuning 92 $47.88 $4,405 $11,145 $12,259 <br />OPAC Installation 75 $47.88 $3,591 $9,085 $9,994 <br />Operation 60 $47.88 $2,873 $7,268 $7,995 <br />OPACTraining 24 $47.88 $1,149 $2,907 $3,198 <br />Software: 348 $41.30 $14,372 $36,362 $40,000 <br />Software Engineering Manager Included <br />System Documentation Included <br />Training Included <br />Software Integration & Testing Included <br />Quality Assurance Included <br />Totals 1,628 $67,504 $170,786 187,865 <br /> <br />PB FARRADYNE 05-16-03 <br />