Laserfiche WebLink
~'~'. Public Road Improvement 12/04~0 <br /> Estimated Costs <br /> <br /> · Form Approved-AVP Law <br /> <br />A-2003-187A <br /> <br /> Improvemems to Existing Public Road At Grade Crossing <br /> For Dyer Road, DOT 761684A <br />M.P. 520.99 Santa Ann Industrial Lead, Los Nietos Subdivision <br />Santa Ann, California <br /> <br /> THIS AGREEMENT, executed in duplicate this~ff7~/ day of .,~ 2003, by and <br />between UNION PACIFIC RAILROAD COMPANY, a Delaware coq~orafion (hereinafter the <br />"Railroad"), and CITY OF Santa Ann, a municipal cerpomtion oftbe State of California (hereinat~er the <br />"Political Body"), WlTNESSETH: <br /> <br />RECITALS: <br /> <br /> The Political Body has requested the Railroad to improve the existing Dyer Road crossing at <br />grade, along, over and across the Railroad's track and right of way at Mile Post 520.99, Santa Ann <br />Industrial Lead, Los Nietns Subdivision, DOT No. 761684A, in City of Santa Am, Orange County, <br />California to which the Railroad is agreeable, but solely upon terms and conditions hereinafter set forth. <br /> <br />AGREEMENT: <br /> <br /> NOW THEREFORE, in consideration of the premises and of the promises and conditions <br />hereinafter set forth, the parties hereto agree as follows: <br /> <br /> 1. The Railroad shall furnish all labor, material, equipment and supervision for, and shall (a) <br />remove the existing plank and asphalt crossing, (h) install a 80 f~. precast concrete crossing, (c) field weld <br />rail, (d) relay track at crossing with 133//rail, (e) renew the erossties, and (f) surface the track with new <br />ballast, all at the intersection of the Railroad's Santa Ann Industrial Lead with Dyer Road at Mile Post <br />520.99 in Santa Ama, Orange County, California, as shown generally on Railroad's print dated June 18, <br />2003, marked Exhibit A, hereto attached and hereby made a pan hereof. <br /> <br /> 2. The Political Body agrees to reimburse the Railroad for one hundred percent (100%) of <br />Railroad's actual labor and material costs associated with the work and materials described in Section 1 <br />above. The Railroad estimates such cost to be fifty one Thousand nine Hundred and fifty two Dollars <br />($51,952), as set forth in Estimate of Material and Force Account dated June 24, 2003 marked Exhibit B, <br />hereto attached and hereby made a part hereof. During the performance of such work the Railroad will <br />provide progressive billing to Political Body based on Railroad's actual costs. Actual costs to the <br />Railroad shall include customary additives to materials, services and labor provided by the Railroad. <br />Within 120 Days after Railroad has completed its work, the Railroad will submit a final billing to <br />Political Body for any balance owed. Political Body shall pay the Railroad within thirty (30) days of its <br />receipt of all bills submitted by the Railroad. <br /> <br /> 3. The Railroad, at its cost, shall maintain the crossing between the track tie ends. If, in the <br />future, the Political Body elects to have the surfacing material between the track tie ends replaced with <br />paving or some surfacing material other than timber planking, the Railroad, at the Political Body's <br />expense, shall install such replacement surfacing. <br /> <br /> 4. The Political Body, at its sole cost and expense, shall provide all labor, material and <br />equipment to install concrete or asphalt street approaches, and if required, will install advanced warning <br />signs, and pavement markings in compliance and conformance with the Manual on Uniform Traffic <br />Coolxol Devices. <br /> <br /> <br />