My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMJM/HARRIS 1 -2001
Clerk
>
Contracts / Agreements
>
D
>
DMJM/HARRIS 1 -2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:04:51 PM
Creation date
11/6/2003 3:35:31 PM
Metadata
Fields
Template:
Contracts
Company Name
DMJM / Harris, dba Holmes & Narver, Inc.
Contract #
A-2001-170A
Agency
Public Works
Council Approval Date
8/20/2001
Insurance Exp Date
4/1/2006
Notes
Amended by A-2003-199, A-2003-199-01, A-2004-252 and A-2001-170A-04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> <br />Hourly Rate Schedule <br /> <br />Engiqe,~~tnd <br /> <br />DMJM+HARRIS' proposed hourly rate schedule is as <br />follows: <br /> Project Principal $172 <br /> Senior Project Manager 140 <br /> <br />Project Manager 120 <br />Technical Specialist 131 <br />Principal Engineer 120 <br />Senior Engineer 102 <br />Engineer 85 <br />Principal Architect 121 <br />Architect 85 <br />Senior CAD 80 <br />Assistant Level <br /> Design Engineer 72 <br />CAD Technician 63 <br />Clerical 58 <br /> <br />Note the above hourly rates are effective through December <br />31, 2001 and may be adjusted after that date to compensate <br />for labor adjustments and other increases in labor cost. The <br />above schedule is for straight time. Overtime will be billed <br />at 1.25 times the hourly rates. Sundays and holidays will be <br />charged at 1.70 times the standard hourly rates. <br /> <br />Other Direct Costs <br />Other direct costs including subconsultants will be re- <br />imbursed at 110 percent of actual costs. <br /> <br />Principal in Charge $111 <br />Project Manager 94 <br />Irrigation Designer 83 <br />Landscape Architect 84 <br />Senior Staff 78 <br />Intermediate Staff 72 <br />Administration 43 <br /> <br />Overtime will be billed at 1.5 times the hourly rates. <br /> <br />REIMBURSABLE EXPENSES: <br /> <br />Plotting $ 30.00/sheet <br />Digital Photographs 25.00/disk <br />Color Printouts 5.00/printout <br />Photocopies .1 O/sheet <br />Laser Plotting 2.00/sheet <br />Bluelines 2.50/24x36 sheet <br />3.5" Disks 2.00/disk <br />Mileage 0.325/mile <br />CD Rom 5.00/each <br /> <br />These rates will remain in effect through December 31, <br />2001. Project escalation 4% for 2002. Contract limits <br />all out-of-pocket expenses such as filing fees, printing, <br />and reproduction. Reimbursable expenses will be invoiced <br />as direct costs plus 10%. <br /> <br />OFFICE RATES <br /> Project Manager $105 <br /> Project Surveyor 90 <br /> Survey Technician 75 <br /> Word Processor 40 <br /> <br />PARTY RATES <br /> Two-Man Party 145 <br /> Three-Man Party 195 <br /> <br />AUTHORIZED OVERTIME On Saturdays and <br /> In Excess of 8 Hours <br /> on Weekdays 1.3 times regular <br /> On Sundays and Holidays 1.6 times regular <br /> <br />Principal 145. <br />Senior Engineer/ <br />Geologist/Scientist 120. <br />Project Engineer/ <br />Geologist/Scientist 110. <br />Operations Manager 95. <br />Soil FieldTechnician 85. <br />CADD Operator/Tech Illustrator 65. <br />Word Processor 65. <br /> <br />Reimbursable expenses will be invoiced at cost plus 15%. <br /> <br />Additional charges for geotechnical services are included <br />on the following page. <br /> <br />MU01-559 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.