Laserfiche WebLink
A D A Construction Services Co. <br />1320-D E. St. Andrew Plc Santa Ana~ Ca. 92705 800-430-5485 Fax 877- 966-9399 <br />Contractors Lic # 813274 Page I of 2 <br /> Slip Grip Treatment Proposal <br /> <br />Client: CITY OF SANTA ANA <br /> <br />Add: 1000 East Santa ana Blvd., <br />Add: Suite 108 <br /> <br />City: Santa gna, Ca. 92701 <br />Job: THE DEPOT AT SANTA ANA <br /> <br />Add: <br />City: <br /> <br />1000 E. Santa Aha Blvd, Suite 108 <br />Santa Ana, Ca. 92701 <br /> <br />Date: 09- 16- 2003 <br /> <br />Cont: Carolyn Fullerton, TST <br />Ph# (714)565~2690 <br />Cell# ( <br />Fax# (714) 565-2693 <br />Arch: City Engineers, Santa Ana <br />Apply: Date: / / 2003 <br /> <br /> Slip Grip Slip Resist Treatment <br />1). Treatment Area: Upstairs Courtyard Balcony under roof line at L-shape walkway. <br />2). Tile Type = Quarry Tile, 12xl 2". Cleaned with S.G. ADA Tile PrepfMaintainer. <br />3). Apply Slip Grip ADA Slip Resistant Treatment to cleaned, prepped surfaces for a <br />safe walking envirorament of ADA Compliant wet surface of 0.70 SG Treated~ from a <br />0.48 COF average in 6 separate Tests of Wet Tile samples with slipper,/surfaces at Job site. <br />Total Labor & S.G. Treatment = $1.45 x 1,800-s~ = $ .. 2~610.00 <br /> <br />A Certified ASTM COF Test Report for Proof of ADA Compliance & Due Diligence for <br />Health Dept; Insurance Liability, W/Comp: renewals, & any future litigation = $ 225.00 <br />Total Base Contract Price: '= $ 2,835.00 <br />Material Deposit needed = 25% = -0- <br />Total due upon Completion with COF Test Report sent upon payment in full: $ 2,835.00 <br />Options: See Page 2 for Optional areas of Slip Grip Treatment. <br />A). SG Penetr: Pro Sealer applied to tiles in this area ~ $1.20-slx 1,800-sf= $ 2,160.00 <br />B). If your floors are cleaned periodically, please use Slip Grip ADA Tile Maintainer <br />Concentrate, the preferred compatible CleanerfDegreaser for removal of grout, soap, oil, <br />grease & non ADA cleaning products with oily residues. This will keep your Treated floor <br />surfaces clean with longer life for an active slip resist finish, when cleaning is necessary, for <br />non-polymerization leading to slippery floors. <br />SG ADA Tile Maintainer Concentrate, an approx: 6 to 12- month supply for use as <br />'needed to scrub'or power wash = $ 34.99 a gal: x 2 + tax = $ 75.00 $ N/C <br />Limited Warranty: The Treatment will last for 2 to 5 years + depending on tile, maintenance and traffic. <br />However, due to Insurance Liability Policy Renewals, possible future litigations and Building / Health Dept: <br />requirements, an Annual ADA Maintenance Contract is available to clean and check for any wear that may <br />diminish, or may cover up the slip resist surface treatment after the original 1-Year Limited Warranty, included <br />in this contract, has expired. See your Teclmician on this exclusive Slip Grip Service and 5-year Extended <br />ADA Limited Warranty Maintenance Contract protection, or see following pages for Warranties. <br /> <br />Hold Harmless: Any written or verbal orders, with or without deposits to apply the Slip Grip Treatment given <br />to this applicator will constitute the knowledge and acceptance of the full meaning of S.G. Limited Warranty <br />(See Page 4) bv the Owner or his Representative who a~reas to hold this contractor and Slip Grip harmless <br />of any and all future direct or indirect liabilities or law suite claims, that may arise from slip/fall incidents on <br />or offthe treated areas with Owners responsible to pay for such liabilities that may arise. Warranty effective <br />date starts the date of the application and goes in force upon receipt of full pawnent. <br />Scheduling of Work: Please advise as soon as possible for expected application time with <br />signed confirmation faxed to 877-966-9399, to allow time for scheduling of work within <br />10- days of receipt of signed Contract & Deposit, for approx: Date of / / 2003~ <br /> <br /> / <br />Base Contract Approved by: Date: <br /> Slip Grip 3ust Common Sense <br /> <br />/2003 <br /> <br />EXHIBIT <br /> <br /> <br />