Laserfiche WebLink
conditions as they are encountered. The audio portion of the videotape shall be free <br />from electrical interference, feedback, hum, and background noise. <br />19. If the camera cannot pass the entire sewer reach from its point of insertion, the reach <br />shall be inspected from both directions. The inspection logs for the reach shall <br />include an identification of the nature and location of the blockage. The consultant <br />shall notify the City immediately of any such obstruction so that it may be verified <br />and/or repaired. <br />20. Video runs showing condensation or submersion of the lens, poor or out -of -focus <br />images, poor audio, or otherwise poor image quality shall be cause for rejection and <br />may necessitate re -televising at the consultant's expense if the City determines the <br />video run is not of acceptable quality. <br />21. In special cases, when directed by the City, the consultant shall be responsible for <br />plugging manhole outlets during videotaping. The sewer lines will be in service at <br />the time of inspection. <br />22. Television inspection of sewer mains with high volumes of flow (pipe running 1/3 <br />full or more) will be done at night between the hours of 10 p.m. and 5 a.m. unless <br />otherwise directed by the City. No adjustment in cost shall be allowed for night <br />work. Notwithstanding, the consultant shall always use whatever mechanical <br />means are available, including modification or changing of the camera wheels or <br />treads, to insure that the image is recorded in an upright, un-rotated position. <br />The City reserves the right to reject any videotape where changes in the orientation of <br />the camera could have been corrected by such modifications. <br />23. Traffic control for sewer inspection shall be the responsibility of the consultant and <br />shall conform to the work Area Traffic Control Handbook (WATCH). Flashing <br />arrow boards shall be used on arterial streets. <br />24. In two (2) working days after being notified to inspect a particular section of sewer <br />main, the consultant shall begin T.V. inspection, and shall diligently pursue that work <br />to completion. In addition, the contractor shall regularly supply an ongoing <br />tabulation of the footage of video recorded, main lines cleaned, along with the <br />associated charges to the City. Such notification shall occur no less than once per <br />week while the consultant is actively doing work for the City or after the completion <br />of designated work, whichever comes first. <br />COMPENSATION <br />The 300,000 L.F. quantity is an estimate only and is shown solely for the purpose of comparing <br />proposals. The City reserves the right to increase or decrease the amount of any quantity shown <br />without any adjustment in the unit price. <br />12 <br />