Laserfiche WebLink
Pacific Coast Cabling <br /> we connect information. <br /> <br />statement of work <br /> <br />Contract Requirements <br /> <br />PCC shat[ provide Certificates of Insurance for General Liability, AutomobiLe Liability, and Workers <br />Compensation and Employers Liability naming City of Santa Ana as additionally insured. <br /> <br />PCC shall provide an installation that is compliant with Avaya installation practices, TIA/EIA-568A, <br />569, 606 and 607 specifications as well as NEC and local building codes. <br /> <br />PCC's price shaft encompass alt app[icabLe costs to provide a turn key structured cabling system <br />solution including but not limited to at~ materials, labor, consumables, storage, waste removal, <br />cable support hardware, toots, equipment, etc. <br /> <br />Tentative Schedule <br />Start Date - November 03 <br />Completion Date - December 03 <br /> <br />O. uality <br />1.0 <br /> <br />2.0 <br /> <br />2.1 <br /> <br />2.2 <br />2.3 <br /> <br />2.4 <br />2.5 <br /> <br />2.6 <br /> <br />Assurance Installation Practices <br />INSTALLATION PRACTICES <br />Ali equipment shat[ be instat{ed in a neat and professional Like manner and to the comp{ete <br />satisfaction of the Client. Any cab[e, or material instal{ed that does not meet the <br />installation specifications provided by the Statement of Work shall be replaced or repaired <br />to Client's fu{l approval without additiona{ cost. <br />INSTALLATION REQUIREMENTS <br />Installation procedures must meet or exceed the requirements listed be[ow: <br />InstalLation and construction practices shat{ be in accordance with local utility practices <br />and agreements, state, city and county ordinances, statutes and regu{ations, the Nationa{ <br />ELectric Safety Code, TIA/EIA-§68A, TIA/EIA-569, TIA/EIA-606 and TIA/EIA-607. <br />The C{ient's Standard Construction Specifications shaLL apply where applicable. <br />AlL equipment deemed necessary must be new and of the type specified in the BiLL of <br />Materia{s. No substituted items shal{ be allowed except as specified or approved by the <br />Client. No custom items shall be at{owed except as specified or approved by the CLient. <br />AlL wiring sha{l conform to the National Electric Code and all applicable Local Codes. <br />Att racks and power supplies shall be earth grounded using #6 AWG, bare copper wire to <br />local ground grid. Customer and its General Contractor is required to provide a terminal <br />ground buss (TGB) in the area of the equipment racks. Att building terminal ground buss <br />(TGB) shall be common{y connected to a main terminal ground buss (MTGB) located near <br />the building's main power buss. <br />Ark cables routed through ceilings, and building structure, shall be supported from the <br />structure independenUy from other trades at intervals that meet applicable federal, state <br />and local building codes. Cab{es shall be routed in such a manner as to aL{ow other <br />maintenance activities to occur without damage to the cable. <br /> <br />2031 e. ce~itos avenuesuite 7b <br />anaheim, ca 92806 <br />t714-563-8070 ~ i4.563-8080 <br /> www.pccinc.com <br /> <br /> <br />