Laserfiche WebLink
Pacific Coast Cabling <br /> we connect information. <br /> <br />durin~ the project, additional costs, damages and/or delays attributed to necessary procedures <br />for workin~ in this environment wilt be the responsibility of the proposed client and/or bui[din~ <br />owner/management. <br /> <br />The information contained in this document is proprietary to Pacific Coast Cabling, Inc. and is <br />intended to be used as evaluation and/or biddin~ information only. No part of this document <br />may be disclosed, reproduced and/or distributed to anyone except the listed recipients within <br />this package without the written permission from Pacific Coast Cabling, Inc.. <br /> <br />This quotation is based upon information provided by the client and is limited to the material <br />and labor items listed herein. Any changes to this quote must be asreed upon by all parties in <br />the form of a written change order and may result in additional charses to the client. ALI <br />change orders must be signed by the customer prior to the commencement of work specified in <br />that chanse order. <br /> <br />Pacific Coast Cablin8 assumes that all pathways are clear and accessible ssdth the necessary <br />capacity for the work to be performed as described in the Specifications/Statement of <br />Work/Scope of Work. It is the responsibility of the client to provide adequate pathways where <br />-deficiencies are present. <br /> <br />8. It is assumed that pull strings will be provided in att conduits installed by others. <br /> <br />9. Certificates of Insurance will be submitted upon request. Special requirements, such as <br /> waiver's of subrogation, may result in additional charges to the customer. <br /> <br />10. Pacific Coast Cabling's quotation is good for (30) days from the date of quotation. <br /> <br />11. This quotation is not to be used as an "Add Et Delete" schedule. <br /> <br />12. If Pacific Coast Cabling crews are required to be on-site durin~ move-in, system start-up, or <br /> first in service, this wiit be biiied on a Time Et Material basis. Pacific Coast Cabling will have <br /> the account manager available during the project cut over on-catt for any questions. <br /> <br />13. <br /> <br />No wall repair, paintin~ or removal of existing/abandoned cable is included in this project. <br />The National Electrical Code (NEC) was amended in 2002. One of the amendments concerns the <br />requirement that abandoned cable (both copper and fiber) be removed. <br />The NEC defines "abandoned cable" as: Installed communications cable that is not terminated <br />at both ends at a connector or other equipment and not identified for future use with a tag." <br />Our bid is provide submitted without costs for any removal of abandoned cable. In the event <br />we are directed to remove abandoned cable, PCC will perform removal work at a YEtM basis. <br /> <br />14. No permit, license, or bond(s) costs are included as a part of this response. <br /> <br />15. Parking will be provided to Pacific Coast Cabling employees at no additional cost. <br /> <br />16. <br /> <br />Pacific Coast Cabling realizes that removal, storage and reinstallation of existing (used) ceiling <br />tiles may result in incidental damages. While Pacific Coast Cabling exercises care in the <br />handling of these tiles, incidental damage may occur. ~,s such, Pacific Coast Cabling accepts <br />no liability for any such incidental damages. <br /> <br />2031 e. cerritos avenue suite 7b <br />anaheim, ca 92806 <br />t714-563-8070 f714-563-8080 <br /> www.pccinc.com <br /> <br /> <br />