My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 2100 W. Alton Ave.-YMCA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
01/20/2004
>
31A - 2100 W. Alton Ave.-YMCA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:03:17 PM
Creation date
1/16/2004 3:18:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
1/20/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measures <br /> <br />Grading plans for the proposed project shall reflect the following notes: <br /> <br />All material excavated or graded will be sufficiently watered to prevent <br />excessive amounts of dust. Watering with complete coverage shall occur <br />at least twice daily, once in the late morning and once after work is done <br />for the day. <br /> <br />10. <br /> <br />All clearing and earthwork activities shall cease during period of high <br />winds (winds greater than 25 mph averaged over one hour) or during <br />Stage 1 or Stage 2 smog episodes. <br /> <br />11. <br /> <br />Streets surrounding the project site should be cleaned at the end of each <br />day of construction. <br /> <br />12. <br /> <br />All matedal transported offsite shall either be sufficiently watered or <br />securely covered to prevent excessive amounts of dust. <br /> <br />13. <br /> <br />The amount of area disturbed by clearing and earthwork activities shall be <br />minimized at all times. <br /> <br />14. <br /> <br />Equipment engines shall be maintained in good condition and in proper <br />tune according to manufacturer's specifications. <br /> <br />15. <br /> <br />To the extent feasible, gasoline powered equipment shall be used for <br />onsite and offsite construction activities. <br /> <br />16. <br /> <br />If cultural resources are encountered during construction activities, all <br />construction operations shall cease in the location of the finding and the <br />City's Environmental Coordinator shall be notified. A qualified <br />archaeologist must be contacted to identify and evaluate the materials and <br />to design and implement any mitigating measures found to be justified. <br />No construction activities shall resume until authorization is obtained from <br />the City's Planning Manager. <br /> <br />17. <br /> <br />Prior to any earth-moving activity in the parcel, a vertebrate paleontologist <br />retained by the developer and approved by the City of Santa Ana shall <br />develop a storage agreement with the LACMVP, the County of Orange <br />paleontologic collection storage facility, or another acceptable museum <br />repository to allow for the permanent storage and maintenance of any <br />fossil remains recovered in the parcel as a result of the monitoring <br />program, and for the archiving of associated specimen data and <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.