Laserfiche WebLink
.AAIDSGROUP <br />M / ♦Mourly <br />Kate <br />Principal <br />$234 <br />Associate Principal <br />$220 <br />Senior Project Manager I Associate <br />$21 1 <br />Senior Planner <br />$21 1 <br />QA/QC Manager <br />$211 <br />Registered Architect I Engineer <br />$197 <br />Project Manager <br />$197 <br />Senior Architect I Engineer <br />$185 <br />Senior Cost Estimator <br />....._.v,.., <br />$175 <br />Project Architect j Engineer <br />$175 <br />Senior Designer <br />$170 _.._._. <br />Design Architect j Engineer <br />_............... ....... ......w.. <br />$160 <br />Specifications Writer <br />$160 <br />Engineering Designer (RIM) <br />_. <br />$139 <br />Architectural Job Captain j Designer <br />_....,_.r_. $132 <br />CAD Drafting Engineer I Architect <br />$1 18 <br />Office Administration <br />$73 <br />Survey Manager <br />$250 _ <br />Project Surveyor <br />_._._.._ <br />$190 <br />2-Man Survey Crew <br />$350 <br />1-Man Survey Crew <br />$225 <br />Expenses such as, but not limited to plan check fees, permits inspections, testing services, title company <br />fees, special delivery charges, plotting/presentation boards, maps, aerial photographs, and reprographics / <br />illustrations that may be required for community or other stakeholder presentations, shall be billed to the <br />owner at Consultant's direct cost plus 5%. <br />