My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TSCM CORPORATION 3 - 2003
Clerk
>
Contracts / Agreements
>
T
>
TSCM CORPORATION 3 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:02:02 PM
Creation date
1/20/2004 3:01:25 PM
Metadata
Fields
Template:
Contracts
Company Name
TSCM Corporation
Contract #
A-2003-238
Agency
Community Development
Council Approval Date
12/1/2003
Expiration Date
12/31/2004
Insurance Exp Date
1/1/2009
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.' <br /> <br /> <br />24 <br /> <br />. <br /> <br />An Environmentally Sensitive Service Corporation <br /> <br />18281 GOTHARD STREET #109 . HUNTINGTON BEACH, CA 92648 . (714) 841-1988' FAX (714) 841-3222 <br />www.tscmcorp.com <br /> <br />PROPERTY SERVICES <br /> <br />I. DESCRIPTION OF METHODS AND EQUIPMENT <br /> <br />A- STEAM CLEANING - PRESSURE WASHING - INDUSTRIAL SCRUBBING <br /> <br />. All waste will be managed according to California title 22 and CFR 49 for the disposal <br />and treatment of both Hazardous and Non- Hazardous Waste streams. <br />. TSCM uses the AGOR (Above Ground Operatíng Reclaimer) and the Mermaid Filter <br />system to process wastewater and recycle the water for continued cleaning in the <br />structures. This means less water used and less waste to be removed by a licensed <br />waste hauler. TSCM uses Infinity Environmental to remove and deliver waste to the <br />proper facility. Infinity provides a waste manifest, which is kept on file in both their <br />headquarters and TSCM's office in Huntington Beach. <br /> <br />CLEANING WITH ENVIRONMENTAL SENSITIVITY AND RESPONSIBILITY: <br />. All drains and easements are boomed and sand bagged to prevent run-off into the <br />storm drains and sanitary sewer system. Water recovery is performed and the water is <br />treated to ensure zero discharae, which means the treated water can be eliminated <br />throuah the sanitary sewer svstem with proper permission from the municipal water <br />district. Our method meets EPA requirements and local POTW's. <br />The oil and other solid waste products of the cleaning process are separated and <br />placed in proper containers for transport and treatment. TSCM contracts with various <br />waste management haulers for the transportation and treatment of the material <br />generated. The property owner is considered the Generator and is provided with a <br />Uniform Hazardous Waste manifest by the hauler and the waste treatment facility will <br />provide the property owner with a certificate of recycling and treatment. <br />. Scrubbing includes: complete cleaning with total removal of water and residue. <br />. TSCM maintains fifteen (15) Hydro-Tek 3500 psi hot water pressure washers I steam <br />cleaning units. These units are capable of removing grease, oil, gum, dirt and grime. <br />The temperature reaches 250 degrees F during the cleaning process. <br /> <br />EQUIPMENT LIST <br /> <br />. TSCM maintains eighteen (18) Chevrolet Y. ton Pickup Trucks <br />. (2) AGOR units (Above Ground Operating Reclaimer) <br />. (8) Mermaid Filter Systems (1 micron ability) <br />
The URL can be used to link to this page
Your browser does not support the video tag.