<br />Table 1 SAVINGS TABLE
<br />
<br />EXHIBIT D
<br />
<br />Year Annual Annual Designated Annual Annual
<br /> Energy Operational Utility Rebate Total Projected Guaranteed
<br /> Savings Savings Savings Savings
<br />Year 0 Construction $100,000 $44,647 $105,000 $249,647 $193,885
<br />Year 1 $311,026 $62,275 $373,301 $371,107
<br />Year 2 $318,802 $63,832 $382,634 $380,360
<br />Year 3 $326,772 $65,428 $392,200 $390,644
<br />Year 4 $334,941 $67,063 $402,005 $392,676
<br />Year 5 $343,315 $68,740 $412,055 $394,025
<br />Year 6 $351,897 $70,459 $422,356 $395~408
<br />Year 7 $360,695 $72,220 $432,915 $396,825
<br />Year 8 $369,712 $74,025 $443,738 $398,278
<br />Year 9 $378,955 $75,876 $454,831 $399,767
<br />Year 10 $388,429 $77,773 $466,202 $401,293
<br />
<br />(Table 1 is based on a utility escalation rate of 2.5% per year, and o ~erational savings escalation of
<br />2.5% per year)
<br />
<br />Section 2: Guaranteed Savings Types
<br />
<br />2.1 Guarantee Types. Option A - Main Meter Comparison, and Option B- Designated.
<br />
<br />Option A - Main Meter Comparison. This approach is intended for measurements of the
<br />whole-facility or specific meter baseline energy use, and measurements of whole-facility or
<br />specific meter post-implementation (Post) energy use can be measured. The methodology
<br />to establish baseline and Post parameter identification, modeling approach and baseline or
<br />model adjustments will be defined in the Measurement and Verification article of this
<br />Exhibit D. Periodic inspections of baseline energy usage, operating practices, and facility
<br />and equipment, and meter measurements of the will be necessary to verify the on-going
<br />efficient operation of the equipment, systems, practices and facility, and saving attainment.
<br />The predetermined schedule for data collection, evaluation, and reporting will be defined in
<br />the Performance Assurance Technical Support Program article of this Exhibit D.
<br />
<br />Option B- Designated. This approach is intended for Facility Improvement Measures
<br />where the end use capacity or operational efficiency; demand, energy consumption or
<br />power level; or manufacturer's measurements, industry standard efficiencies or operating
<br />hours are known in advance, and used in a calculation or analysis method that will stipulate
<br />the outcome. Both Customer and Contractor agree to the stipulated inputs and outcome(s)
<br />of the analysis methodology. Based on the established analytical methodology the savings
<br />stipulated will be achieved upon completion of the Facility Improvement Measures Work