My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-005 - Approving General Plan Amendement No. 2003-05
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2004
>
2004-005 - Approving General Plan Amendement No. 2003-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:28:38 PM
Creation date
1/28/2004 1:55:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2004-005
Date
1/20/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />14. <br /> <br /> permit number and two copies of the Storm Water Pollution <br /> Prevention Plan. <br /> <br />d. Prepare an NPDES post-construction storm water management <br /> plan in accordance with the Orange County Drainage Area <br /> Management Plan (DAMP) that includes all Structural and Non- <br /> Structural "Best Management Practices" for the project. <br /> <br />e. Submit and have approved a surface drainage/utility plan that <br /> includes all Structural "Best Management Practices". <br /> <br />f. Provide two copies of the "Water Quality Management Plan" that <br /> includes a description of all applicable Structural and Non- <br /> Structural "Best Management Practices" which may apply to this <br /> project. <br /> <br />The proposed project will be subject to the City of Santa Ana Federal <br />Clean Water Protection Enterprise Fees. <br /> <br />Building plans shall reflect the restaurant be fitted with a grease <br />interceptor and shall be regularly maintained. <br />Prior to the issuance of building permits, the project developer shall submit <br />evidence to the City of Santa Ana of a payment between the developer <br />and the Santa Ana Unified School District to offset school facilities related <br />impacts. <br /> <br />Prior to plan check approval, compliance shall be met with the California <br />Code of Regulations, Title 24, regarding pedestrian sidewalk for the <br />southwest corner public right-of-way and along the sidewalk along Main <br />Street between First and Walnut Streets. <br /> <br />This project involves construction activities that result in a land <br />disturbance of one or more acres. Project owner(s), including the <br />landowner and involved developers, must obtain coverage from the State <br />Water Resource Control Board under the General Construction Storm <br />Water Permit to discharge storm water associated with construction <br />activity. <br /> <br />Police Department <br /> <br />1. The existing building and required parking for the proposed use must <br /> conform with the provisions of Chapter 8, Article II, Division 3 of the Santa <br /> Aha Municipal Code (Building Security Ordinance). These code <br /> conditions will require that the existing project's lighting, door/window <br /> locking devices and addressing be upgraded to current code standards. <br /> Lighting standards cannot be located in required landscape planters. <br /> <br />2. The applicant shall be responsible for maintaining the premises free of <br /> graffiti. All graffiti shall be removed within 24 hours of occurrence. <br /> <br />Resolution No. 2004-005 <br />Page 12 of 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.