Laserfiche WebLink
7. The pedestrian plaza area shall be enhanced, incorporating decorative <br /> paving and incorporate a double row of trees or a specific pattern <br /> designed to lead pedestrians through the plaza to the adjacent entrance of <br /> the building. <br /> <br />8. The pedestrian plaza area shall be enclosed with an ornamental wrought <br /> iron fence with gate along First Street for pedestrians to access. The <br /> wrought iron fence shall complement the historic characteristics of the <br /> United Automotive building. The maximum height the fence along First <br /> Street shall be 48 inches. <br /> <br />9. The applicant is required to submit plans to the City for approval by the <br /> Planning Commission for the pedestrian plaza prior to any construction of <br /> plaza improvements. These plans shall include a maintenance strategy <br /> for long-term maintenance and operation of all plaza improvements, <br /> including all features. <br /> <br /> 10. The pedestrian plaza area is required to be completed and finaled by the <br /> City prior to issuance of a Certificate of Occupancy for the restaurant. <br /> <br /> 11. The primary entrance door to the restaurant shall be the north vestibule <br /> entry of the west elevation. This entrance shall include an interior sound <br /> curtain to mitigate interior restaurant ambient noise levels to the exterior. <br /> All doors on the west elevation shall remain closed during business hours. <br /> <br /> 12. The applicant must sign a Right-of-Entry and License Agreement with the <br /> City to facilitate the development of a plaza area. <br /> <br /> 13. The entry doors on the Main Street elevation shall be operable and <br /> available for patron use. <br /> <br /> 14. The restaurant shall be maintained as a bona fide restaurant/eating <br /> establishment at all times during all operating hours. <br /> <br /> 15. Consistent with Section 9 of Specific Development No. 72, a sign program <br /> pursuant to 41-880 through 884 of the SAMC shall be submitted prior to <br /> issuance of a Certificate of Occupancy. <br /> <br /> 16. Windows shall not be covered or made opaque in any way. All windows <br /> and transparent entrances shall be unobstructed at all times to allow the <br /> Police Department an unimpeded view of the interior. <br /> <br />17. Within 60 days of approval of Conditional Use Permit 2003-31, the <br /> applicant shall provide for the Planning Commission review an <br /> improvement plan for the plaza/courtyard and public art. Any water <br /> features shall require routine and ongoing maintenance to ensure <br /> operability of the water features at all times. <br /> <br />Miti.qation Measures <br /> <br />18. Prior to the issuance of building permits, the project developer shall submit <br /> evidence to the City of Santa Ana of a payment between the developer <br /> <br />Resolution No.2004-005 <br /> Page 7 of 13 <br /> <br /> <br />