My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KORVE ENGINEERING, INC. 1
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
K-L (INACTIVE)
>
KORVE ENGINEERING, INC. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2015 10:17:51 AM
Creation date
2/20/2004 11:15:29 AM
Metadata
Fields
Template:
Contracts
Company Name
Korve Engineering, Inc.
Contract #
N-2003-152
Agency
Public Works
Expiration Date
12/31/2004
Insurance Exp Date
9/1/2004
Destruction Year
2010
Notes
Amended by N-2003-152-01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Korve <br />I Engineering <br />Ms. Monica Suter <br />October 30, 2003 <br />Page 3 <br />• Grade crossings with pre - emotion to an adjacent traffic signal, <br />• Grade crossings with pre - signal (queue cutter signal), without railroad pre - emption. <br />• Grade crossings with pre - signal (queue cutter signal), with railroad pre- emption, <br />Task 4 - Cost Estimates for Improvements Studied <br />KORVE will determine a rough order of rnagnitudN cost estimate for each of the three <br />scenarios. including estimates for work conducted on railroad property. The costs will be <br />based on readily available data, including the OCTA Grade Crossing Study. The cost of the <br />three scenarios will I hen b e compared to the relative love] of benefit of e ach. This cost <br />estimate will improve o n t he p tanning level c ust c st irri p rovided i n the O CTA G Fade <br />Crossing Study by evaluating costs specific to the three crossings. <br />Task 5 • Identification of Grant Funding Sources <br />KORVE will Identify potential funding sources for the necessary grade crossing <br />Improvements. Such funding will include Federal, Slate arid local agency programs. <br />KORVE will also identify dateNear when the grant applications are due for the next cycle <br />that gets submitted. <br />Task G - Draft Technical Memorandum <br />KORVE will prepare the draft Technical MCrOrandUm upon completion of the grade <br />crossing mobility analysis and cost estimate tasks. The report will discuss the purpose of <br />the report, background, mobility findings, oust estimate, recommendations and funding <br />sources. <br />KORVE will submit three (3) ct)pies of the Draft Technicat Momorandum to the City of <br />Santa Ana for review. <br />Task 7 -Final Technical Memorandum <br />After obtaining comments on the draft repon from the City or Santa Ana, KORVE will <br />address final review comments and submit the ap^.roved Final Grade Crossing Mobility <br />Study Technical Memorandum to the City of Santa Ana_ Three (3) copies of the Final <br />Technical Memorandum will be submitted. <br />Cost <br />KORVE will perform the Scope of Services outlined above for the following amounts on a <br />linie and materials basis. The budget is suntcr:arized beiow, with a detailed cost summary <br />included as Table 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.