Laserfiche WebLink
0 <br />Attachment 3 — Supporting Documentation <br />+ City of Santa Ana <br />Hereinafter Referred to as CONTRACTOR <br />AB 2766 Contract Number S0102 <br />2. CNG Fueling Station Specifications <br />The CNG fueling station to be constructed pursuant to this contract is described <br />as follows: <br />A. Four station, time fill, Ingersoll Rand Model 20H40NGSX CNG <br />compressor rated at 58 CFM at 20 psig at 5000 psi discharge pressure. <br />Installation will include air-cooled inter -coolers, after cooler and moisture <br />separtators for second, third, and fourth stage coolers, CNG dryer, and <br />Roots flow meter. <br />B. Location shall be the City of Santa Ana Yard at 215 S. Center Street, <br />Santa Ana. <br />C. Fueling station will not offer public accessibility. <br />D. Hours of operation shall be daily from 5:00 pm to 6:00 am. <br />E. City of Santa Ana vehicles shall serve as primary users of the facility. <br />F. Primary vehicle type to use the facility shall be street sweepers and other <br />heavy duty vehicles. <br />G. CONTRACTOR shall use standard government bid and award practice to <br />identify subcontractor for station construction. <br />