Laserfiche WebLink
Attachment 1 — Statement of Work and Project Schedule <br />City of Santa Ana <br />Hereinafter Referred to as CONTRACTOR <br />AB 2766 Contract Number S0102 <br />Project Description <br />CONTRACTOR shall purchase four Elgin Eagle street sweepers as specified below. <br />CONTRACTOR shall also construct a CNG fueling station as specified in Attachment 3, <br />Supporting Documents, Station Specifications. <br />Statement of Work <br />CONTRACTOR shall purchase four (4) OEM CNG powered heavy-duty vehicles as <br />follows: <br />Vehicle <br />Life <br />Miles Per Year <br />Expectancy <br />Four Elgin Eagle Street Sweepers with <br />5 years <br />4,120 each <br />Cummins B5.9L CNG Main Engine and <br />each <br />GM 3.OL CNG auxiliary engine. <br />CONTRACTOR shall be reimbursed for each vehicle according to the costs stated in <br />Attachment 2 — Cost Schedule, upon proof of vehicle delivery, vehicle acceptance, and <br />placement of vehicle into service. Engines must be certified for sale in California by <br />California Air Resources Board prior to the release of MSRC funds. <br />CONTRACTOR shall place vehicles into service within eighteen (18) months of contract <br />execution and shall demonstrate and report on vehicle performance (refer to Project <br />Schedule for reporting) for a minimum of six (6) months. <br />CONTRACTOR shall construct CNG fueling station as specified in Attachment 3, <br />Fueling Station Specifications. CONTRACTOR shall be reimbursed according to <br />Attachment 2, Cost Schedule, after verification that station construction is complete and <br />that station is fully operational. <br />