My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MUNICIPAL WATER DISTRICT OF ORANGE COUNTY (3) - 2004
Clerk
>
Contracts / Agreements
>
M
>
MUNICIPAL WATER DISTRICT OF ORANGE COUNTY (3) - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:39:53 PM
Creation date
3/30/2004 12:43:05 PM
Metadata
Fields
Template:
Contracts
Company Name
Municipal Water District of Orange County
Contract #
A-2004-030
Agency
Public Works
Council Approval Date
3/15/2004
Insurance Exp Date
10/1/2008
Notes
Amends A-2002-123
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />Attachment B <br /> <br />Participating Selected Well Site Location and Infonnation <br />Agencv Well Site <br />City of Buena Malvern BP- 8242 Linden Circle. It is proposed to construct and operate a new water <br />Park 02 well, pump and treatment system on this City-owned site. There is an <br />existing Citv well and pump station at this site. <br /> Adjacent to New Well #52; Location on the SE corner of Anaheim Lake on OCWD <br />City of Anaheim property: Construct a new production well connected to the existing City's <br />Anaheim Lake reservoir via an existing 42" pipeline. A nerimeter wall will be reouired <br /> SW corner of Chapman A venue and Haster Street. It is proposed to <br />City of Garden Well Number construct and operate a new water well, pump station and water treatment <br />Grove 30 facility. After construction, the above ground well head, <br />instrumentation/controls and water facility will be enclosed within a <br /> masonrv block building. <br /> NW corner of Flower St. and Sixth St. at the Santa Ana Stadium. A new <br /> well, pump station, and disinfection treatment facility located in the parking <br /> lot at the Santa Ana Stadium. The pump, well head, all controls and <br /> treatment systems will be housed in a building designed with architectural <br />City of Santa Ana Stadium Well features to blend m with the adjacent stadium facility. A small <br />(approximately 400 sq. ft.) office room to be occupied by City staff will be <br /> constructed as part of the pump building. City will pay up to $50.000 for <br /> this office room. High strength low allow (corten) steel casing with 304 <br /> stainless steel screens shall be installed. The well motor shall be equipped <br /> with a variable frequency drive. <br /> DOl N. Mabury Street, Mabury Park at Corner of Fruit Street and Mabury <br /> St. It is proposed to construct and operate a new water well, pump station <br /> and treatment facility for disinfection in Mabury Park, located within a <br />City of Santa Ana Mabury Park residential area. The pump, well head. all controls and treatment systems <br />Number 40 will be housed in a building with a split face block wall and angular metal <br /> roof with attached overhangs for a covered picroc area. City will pay up to <br /> $42.000 for the picnic area improvements. High strength low allow (corten) <br /> steel casing with 304 stainless steel screens shall be installed. <br />Southern Valley View 9241 S. Valley View Street (City of Cypress). The 15,000-square-foot site <br />California Water Well Number contains an existing well, pump station and treatment facility. A new well <br />Company 2 will be drilled to 1,000 feet to produce a maximum production capacity of <br />2,500 gpm. The existing well will be used as backun to new well. <br /> 13369-13371 Golden West Street. It is proposed to construct and operate a <br /> replacement water well and pump station on this City-owned site. There is <br />City of Well Number an existing well, pump station and water disinfection located at 13369 GW <br />Westminster 75A St. The City owns the residential lot adjacent to 13371 GW St and plans to <br /> demolish the house, abandon the existing well and use the combined sites <br /> for placement of a new well of greater DunminQ canacitv and Dunm station. <br /> 913 Richfield Road (City of Placentia). It is proposed to construct a new <br />Yorba Linda Well Number well which would allow the YL WD to extract water in excess of its normal <br />Water District 19 production during dry, drought or emergency situations. This project <br />includes the well drilling and installation of well. pump, motor and <br /> connections to the existing water and storm drain ninelines. <br />
The URL can be used to link to this page
Your browser does not support the video tag.