Laserfiche WebLink
<br />Change Order No.2 <br />Project No. 1759, 1760, 1761, and 1762 <br />May 3, 2004 <br />Page 2 <br /> <br />This proj ect provides for traffic signal system detection, including <br />closed circuit TV, at various locations. As part of this project, the <br />contractor installs conduit and pullboxes. <br /> <br />During construction, the actual length of conduit and number of <br />pullboxes that are to be installed were found to be more than the <br />estimated quantity shown on the contract documents. There are <br />approximately 50 additional pullboxes and approximately 1800 additional <br />feet of conduit. Therefore, a change order is required to cover the <br />extra costs exceeding the project contingency. <br /> <br />ESTIMATED COST = $45,000 <br /> <br />FISCAL IMPACT <br /> <br />The estimated cost for the change order is $45,000. Funds are available <br />in the Measure M Competitive fund (account no. 32-551-6631), the Select <br />Street Construction fund (account no. 59-551-6631), and the <br />Transportation System Improvement Area E fund (account 34-431-6631). <br /> <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br /> <br />h í/;Pc~ <br />James G. oss <br />Executive Director <br />Public Works Agency <br /> <br />td~.;y -/'-~ <br /> <br />i [.",U /1. [Ú(ó>U¿..lV <br />Rod R. Coloma <br />Executive Director <br />Finance & Management Services <br /> <br /> <br />Agency <br /> <br />K, \Construction\RFCA-draft\1759 2004-05-03 CO2 <br /> <br />238-2 <br />