Laserfiche WebLink
<br />~en,t By.: ,'GC ENV.IRONMENTAL <br /> <br />RING; <br /> <br />714 632 9968; <br /> <br />Mar-26-04 15:33; <br /> <br />Page 7/21 <br /> <br />. We will inteI1lÌew à maximum of tWo selected key personnel per site who may have <br />historical environmèntal infonnation of ~ subject site. Client will be responsible for <br />supplying the names and phone numbers of two key personnel to be interviewed. <br /> <br />. Reasonably ascertainable geological ~ hydrogeological information for the general area <br />of the site. <br /> <br />Task 3.0 Site Reconnmsa"ce <br /> <br />We will conduct a site visitto observe field conditions indicating recognizable environmental <br />conditions in connection with the property which may include: <br /> <br />. Obvious location(s)of suspected past III1d present hazardous ~ storage, application, <br />use. and disposal areu. <br /> <br />. Obvious loçation(s) of aboveground and underground ~rage tanks, pipeli:nes, wells, <br />transformers, and n(jte building materials suspected to contain asbestos. <br /> <br />. Obvious uses and environmental conditions of IU'eaS of concern as noted in the review of <br />the aerial photography. <br /> <br />. Note facilities adjacent to the site that have an obvious poIeDtial to affeçt the enviroI¡mental <br />conditions at the site. <br /> <br />We may photographi{:al1y document adverse site ÇOnditiODS, if any, at the time of the site visit. <br /> <br />Task 4.0 Final Report ojFilldings <br /> <br />A report of findings will be prepared for eaçh property which will include tbI: information obtained <br />from the Phase I envíronménta1 site assessment. The report will include photographs and pertinent <br />reguJatory agency documèntation regarding the site.' The report will discuss findings and <br />recommendations. ' <br /> <br />1.2 <br /> <br />Asbøtos LemJ Maiuiøl Sampling arid Analysh <br /> <br />In addition to Phase I ESA, the single and mUlti-family residential properties will be checked for <br />the presençe of asbestos and lead in for the purpose of estab1ishiDg health and safety <br />requiremenu during demolition and disposal requirements. <br /> <br />GCE understand that theS'e properties are presently occupied, but wiU be vac:ant at the time of <br />sampling, and that these ,ptoperiies need to be cheçked for the: prescnçe of asbestos and 1e~d prior <br />to demolition and disposal of the constrUCtion debris. <br /> <br />3 <br />\~II._ald&lo2\O...._PltOPOS..t.s\Cky.r s.... ....1041'-03-0 I S En""- S<rrtca.4øç <br />