My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MULLEN & ASSOCIATES 1 - 2004
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
MULLEN & ASSOCIATES 1 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2015 1:56:11 PM
Creation date
5/7/2004 1:28:28 PM
Metadata
Fields
Template:
Contracts
Company Name
Mullen & Associates, Inc.
Contract #
N-2004-031
Agency
Parks, Recreation, & Community Services
Expiration Date
6/30/2004
Insurance Exp Date
7/24/2004
Destruction Year
2011
Notes
Amended by N-2004-031-01
Document Relationships
MULLEN & ASSOCIATES 1A - 2004
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar•10. 2004 6,35PM MULLEN & ASSOCIATES,INC• No•5961 P. 2 <br />MULLEN & <br />Q ASSOCIATES 1200 N. JeKersott St. Unit D, Anaheim, CA 92807 <br />INCORPORATED (714) 632-6620 PAX (714) 632-3849 <br />CONSULTING ELECTRICAL ENGINEERS <br />March 10, 2004 <br />CITY OF SANTA ANA <br />Department of Pazks & Recreation <br />888 W. Santa Ana Blvd., #200 <br />Santa Ana, CA 92701 <br />Attention; Ron Ono <br />Subject : Proposal for Electrical Engineering Services on Santa Ana Zaa Sound System <br />Dear Ron: <br />In accordance with your request, we are submitting for your approval, our proposal for performing the <br />electrical engineering on the above rooted project as herein defined: <br />SCOPE OF y\ ORK <br />1. Design electrical system for site wide Public Address System including conduits for future <br />C.C.T.V. Recommend 60 speakers 50 ft. o.c. Cost of complete system including amps, wire, <br />conduit, mounting, speakers, etc. is estimated to be forty to seventy thousand dollars. <br />2, Meet with City staff to define: <br />A. Electrical requirements of equipment. <br />B. Sound requirements. <br />3. Detail electrical work to support competitive bidding, including: <br />A, Plan drawings. <br />B, Pauel schedules. <br />C. Single line diagrams. <br />D. Sound block diagrams. <br />E. .Device mounting details. <br />F. Equipment rack elevations. <br />5, Review shop drawings. <br />6. Specifications prepazed by Mullen and Associates, Tnc. <br />7. Field investigation. <br />EXHIBIT A 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.