Laserfiche WebLink
<br />Specifications: 01-2004-RFP 1 <br /> <br />7. Remove the purge from motor on York chiller and repair the purge unit. <br /> <br />Price $ <br /> <br />( -¿.'"2..J- <br />) <br /> <br />(-<) ,u,¡w.(f,~r <br />8. Remove scale and rust on ê,~!,Oj"lu, coil heat exchanger and epoxy coat bundle and <br />end bells on York chiller model YTHIJ3E2CRG. <br /> <br />Pri ce $ <br /> <br />2 J::¡- S- <br />f <br /> <br />9. Wrap over the existing insulation at the City Library with an fsk foil paper - tie foil in <br />place. <br /> <br />Pri ce $ <br /> <br />37 So- <br />I <br /> <br />/ <br /> <br />10, Provide annual Preventive Maintenance and inspection on (2) Brian boilers model <br />RV450-W-FDG-WXL 3,600,000 MBH (1995). <br /> <br />Pri ce $ <br /> <br />Zß<rs-- <br />/ <br /> <br />11. Provide annual Preventive Maintenance and inspection on (1) Ajax Boiler model <br />WNGl250W SN 54579-30HP. <br /> <br />Price $ <br /> <br />{( 7'5~ - <br />, <br /> <br />12. Provide annual Preventive Maintenance on (4) hot water boilers models <br />(2) 1250 N 600 ATP-PVI 1,000,000 BTUI HR, (2) 1500 N 1500 ATP -PVI 1,200, <br />000 BTUIHR. <br /> <br />Price $ <br /> <br />I) Ca..y,;; - <br /> <br />13. Remove combustion chamber module ITom PVI water heater model #1250N600TP <br />serial number 129483821. Clean mounting surface and 0 ring surface, install new <br />combustion chamber module with new nuts, pressure test at nonnal operating <br />pressure and check for leaks. Install new five collectors and connect to existing five. <br />Reinstall existing burner, piping and electrical. Start burner, test all controls for <br />proper operation and put into service. Adjust burner for optimum efficiency. <br /> <br />Price $~{ qú- <br />, <br /> <br />9 <br /> <br />Revised 01/14/04 <br />