Laserfiche WebLink
<br />ATTACHMENT B <br />COST ESTIMATE OF SCRRA SERVICES <br /> <br />Grand Avenue <br />Orange Subdivision Crossing No. 101 OR-176.20 <br /> <br />Signal Construction Cost <br /> <br />$181,059.73 <br /> <br />Material <br />Labor <br />Equipment <br />Engineering Design <br />Construction Over Site <br /> <br />$73,735.97 <br />$54,574.08 <br />$13,334.00 <br />$11,561.92 <br />$2,880.00 <br /> <br />Sub-Total <br /> <br />$156,085.97 <br /> <br />Contingency and Agency Cost <br /> <br />$24,973.76 <br /> <br />Total Estimated Signal Cost <br /> <br />$181,059.73 <br /> <br />Track Construction Cost <br /> <br />$62,400.00 <br /> <br />Improve existing track, Install 48-foot <br />Panels and all other Incidentals <br />(48-foot crossing at $1300 per foot) <br /> <br />Engineering, Administration, Consultation, Documentation <br /> <br />$22,000.27 <br /> <br />Flagging and Inspection Services <br /> <br />$15.000.00 <br /> <br />Total Estimated SCRRA Cost <br /> <br />$280,460,00 <br /> <br />Notes: <br /> <br />I. <br /> <br />The cost and expense shown herein is an estimate only and CITY shall reimburse SCRRA on the basis of actual cost. <br /> <br />2. <br /> <br />The CITY will provide Traffic control during SCRRA's grade crossing construction. <br /> <br />Grand Avenue Improvement project <br />Crossing No. 101 OR-176.20 <br /> <br />- 8- <br /> <br />Construction and Maintenance Agreement <br />04/07/04 <br />