Laserfiche WebLink
<br />RESOLUTION 2004-033 <br />REVENUE <br />ACCOUNT <br /> <br />SECTION X <br />5913 <br /> <br />5913 <br /> <br />5913 <br /> <br />5913 <br /> <br />5913 <br /> <br />5913 <br /> <br />5913 <br /> <br />5913 <br /> <br />5403 <br /> <br />5915 <br /> <br />DEPARTMENTIMISCELLANEOUS FEE OR SERVICE <br /> <br />PLANNING & BUILDING AGENCY <br />15) Lighting standards: <br /> <br />With one (1) fixture each <br /> <br />Each additional fixture on the same standard <br /> <br />16) Time clock or photo electric cell, each <br /> <br />17) Radiant ceiling heat per room <br /> <br />18) Power apparatus: generators, motors, transformers, <br />rectifiers, synchronous converters, capacitors, <br />industrial heating, cooking or baking equipment, and <br />other apparatus as follows: <br /> <br />(Ratings - horsepower (HP), kilowatts (KW), and <br />Kilovolt amps (KV A)) <br /> <br />Up to and including I HP, KW, KVA each <br /> <br />Over I and not over 10 HP, KW, KVA each <br /> <br />Over 10 and not over 50 HP, KW, KVA each <br /> <br />Over 50 and not over 100 HP, KW, KV A each <br /> <br />Over 100 and not over 500 HP, KW, KVA each <br /> <br />Over 500 HP, KW, KVA each <br /> <br />19) <br /> <br />Demolition, per project <br /> <br />20) <br /> <br />Inspections outside of normal business hours (four hour <br />minimum charge for Holidays, Saturday or Sunday <br />inspections) <br /> <br />21) Re-inspection fee assessed under applicable provisions <br />of the Building Code <br /> <br />22) Inspections for which no fee is specifically <br />indicated (minimum charge - one (I) hour) <br /> <br />23) Additional plan review required by changes, additions, or <br />revisions to approved plans (minimum charge. one (1) hour) <br /> <br />ELECTRICAL PLAN CHECK FEES <br /> <br />Whenever electrical plans are required by the Building <br />Official, plan check fees sha1l be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br /> <br />MECHANICAL CODE <br /> <br />Any person desiring a permit required by the Mechanical <br />Code shall, at the time of filing an application, pay a fee <br />of$3.50 towards the State Mandated Training Program <br />and pay a fee equal to $27.50 plus the sum of the fees for the <br />work to be done under the permit as set forth in the following <br />schedule. There is no minimum fee for the issuance ofa <br />permit for sing!e family residences and duplexes. The <br />minimum total fee for issuance of a permit for all other uses <br />shall be $50.00 <br /> <br />Note: A mechanical Code permit fee is separate from and <br />additional to the fee for any other permit which may be <br />required by Code provisions other than the Mechanical <br />Code. <br /> <br />75A..2-53 <br /> <br />UNIT <br /> <br />FY 04-05 <br />FEES <br /> <br />Each 8,50 <br />Each 2.55 <br />Each 6.70 <br />Per Room 8.50 <br /> <br />Each 3,60 <br />Each 900 <br />Each 18.25 <br />Each 38.50 <br />Each 51.50 <br />Each 64.25 <br />Per Project 25.00 <br />Per Hour 6425 <br /> <br />Per Hour 64.25 <br />Per Hour 64.25 <br />Per Hour 64.25 <br /> <br />Each Permit <br /> <br />31.00 <br />