My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22C - WALNUT PUMP MOTOR REPLACE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
06/07/2004
>
22C - WALNUT PUMP MOTOR REPLACE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:02:22 PM
Creation date
6/7/2004 3:49:09 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
22C
Date
6/7/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ABSTRACT OF BIDS <br />8 CONTRACT AWARD FOR MOTOR <br />REPLACEMENT AT WALNUT PUMPING <br />(Spec. No. 04-055) <br /> <br />STATION <br /> <br /> Vendor Bakersfield SOCal Pump and Beylik RPM Electric <br /> Well and Pump Well Drilling, Drilling, Inc. Motors <br /> Company Inc. <br /> Location Bakersfield Riverside La Habra Westminster <br /> Labor/ <br /> Materials* $39,897.06 $40,238.54 $43,946.00 $46,890.00 <br /> Price <br /> *Tax @ 7.75% $ 2,447.94 $ 2,610.00 $ 3,405.00 $ 2,424.98 <br /> (materials <br /> only) <br /> Total <br />8 Cost $42,345.00 $42,848.54 $47,351.00 $49,314.98 <br />1% Local <br /> Vendor N/A N/A N/A N/A <br /> Preference <br /> <br />. <br /> <br />EXHIBIT 1 <br /> <br />22C-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.