My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22G - DETECTION INSTRUMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
06/07/2004
>
22G - DETECTION INSTRUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:02:22 PM
Creation date
6/7/2004 4:05:51 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
22G
Date
6/7/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8 <br /> <br />ABSTRACT FOR BIDS - 04-061 DETECTION INSTRUMENTS AND EQUIPMENT AND MAINTENANCE <br /> <br />BIDDER: UNITED INDUSTRIES INC. SKC-WEST, INC. <br />TERMS: 3% 25, NET 40 NET 30 <br />LOC: ORANGE, CA FULLERTON, CA <br />EQUIPMENT: $31,714.00 $32,698.70 <br />MAINTENANCE>: $ 6,480.00 $ 6,422.40 <br />SUBTOTAL: $38,194.00 $39,121.10 <br />7.75% TAX: $ 2,960.04 $ 3,031.89 <br />TOTAL: ~41, J.54. 041 $42,J.52.99 <br /> <br /> BIDDER: DRAEGER SAFETY FISHER SAFETY <br /> TERMS: NET 30 NET 30 <br /> LOC: CARSON, CA CO TO DE CAZA, CA <br />8 EQUIPMENT: $36,469.00 $60,736.39 <br /> MAINTENANCE>: $ 7,632.00 $ 7,380.00 <br /> SUBTOTAL: $44,101.00 $68,116.39 <br /> 7.75% TAX: $ 3,417.83 $ 5,279.02 <br /> TOTAL: $47,5J.8.83 $73,395.41 <br /> <br />* Maintenance includes sensor calibration and on-site field service. Costs based <br />upon 12 sensors calibrated quarterly for three years at Santa Ana Fire Department. <br /> <br />SUMMARY OF BID AWARD: <br />TOTAL AWARD AMOUNT NOT TO EXCEED: <br /> <br />UNITED INDUSTRIES INC. <br />$4J.,J.54.04 <br /> <br />. <br /> <br />EXHIBIT 1 <br /> <br />22G-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.