My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 1901 N. TUSTIN AVENUE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
06/07/2004
>
31A - 1901 N. TUSTIN AVENUE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:02:26 PM
Creation date
6/7/2004 4:17:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
6/7/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~AYI0,2004 <br />WIoAGE 2 OF 2 <br /> <br />8. <br /> <br />9. <br /> <br />10. <br /> <br />All walls where window openings are closed are required to be <br />re-stucco'd. The exterior stucco is required to be a smooth, <br />hand-troweled like finish. <br /> <br />Public payphones, if provided, may <br />buildings or the interior of the site. <br /> <br />only <br /> <br />be <br /> <br />located <br /> <br />within <br /> <br />Any amendment to this variance must be <br />Planning Division for review. At this <br />determine if administrative relief is <br />variance must be amended. <br /> <br />submitted to <br />time, staff <br />available or <br /> <br />the <br />will <br />the <br /> <br />Mitigation Measures <br /> <br />11. <br /> <br />. <br /> <br />12. <br /> <br />13 . <br /> <br />14. <br /> <br />Prior to issuance of demolition <br />paint survey shall be prepared <br />Department for review. <br /> <br />permits, an asbestos and lead <br />and submitted to the Planning <br /> <br />All testing, handling and removal of asbestos containing <br />building materials and lead paint shall be performed by a <br />certified California State Licensed contractor that has been <br />certified under the California Occupational Safety and Health <br />Administration. <br /> <br />Building plans for the proposed project shall identify that <br />Best Management Practices shall be employed during <br />construction operations. <br /> <br />Building plans shall reflect that the kitchen for the proposed <br />project is fitted with a grease interceptor to the size and <br />capacity as designated by the Building and Safety Division. <br /> <br />B. <br /> <br />Police Department <br /> <br />1. <br /> <br />. <br /> <br />The existing building and parking lot must conform with the <br />provisions of Chapter 8, Article II, Division 3 of the Santa <br />Ana Municipal Code (Building Security Ordinance). These code <br />conditions will require that the existing projects lighting, <br />door/window locking devices and addressing be upgraded to <br />current code standards. Lighting standards cannot be located <br />in required landscape planters. <br /> <br />31A-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.