Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />BAGLE ME <br />MITIGATIOPN MONITORING PROGRAM ER 99-152 <br /> <br />MITIGATION MEASURE <br /> <br />Prior to issuance <br />of demolition <br />permits, an <br />asbestos and lead <br />paint survey shall <br />be prepared and <br />submitted to the <br />Planning <br />Department for <br />review. <br /> <br />All testing, <br />handling and <br />removal of <br />asbestos <br />containing <br />building materials <br />and lead paint <br />shall be performed <br />by a certified <br />California State <br />licensed <br />contractor that <br />has been certified <br />under the <br />California <br />occupational <br />Safety and Health <br />Administration. <br /> <br />Building plans for <br />the proposed <br />project shall <br />identify that Best <br />Management <br />Practices shall be <br />employed during <br />construction <br />operations. <br /> <br />Building plans <br />shall reflect that <br />the kitchen for <br />the proposed <br />project shall be <br />fitted with a <br /> <br />TIMMING <br /> <br />Prior to <br />demolition <br />permits <br /> <br />During <br />construction <br /> <br />Prior to <br />Building <br />Permits and <br />during <br />construction <br /> <br />Prior to <br />Building <br />Permits <br /> <br />RESPONSIBLE <br />AGENCY <br />Building/Planning <br /> <br />VERIFICATION <br /> <br />Building/Planning <br /> <br />Building/Planning <br /> <br />Building/Planning <br /> <br />3iÄ:5~ <br />