My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22D - MOTOR CONTROL CTR UPDATE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
06/21/2004
>
22D - MOTOR CONTROL CTR UPDATE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:02:13 PM
Creation date
7/2/2004 2:15:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
22D
Date
7/21/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUEST FOR <br />8 COUNCIL ACTION <br /> <br />CITY COUNCIL MEETING DATE: <br /> <br /> <br />CLERK OF COUNCIL USE ONLY: <br /> <br />JUNE 21, 2004 <br /> <br />TITLE: <br /> <br />CONTRACT AWARD FOR <br />MOTOR CONTROL CENTER UPGRADE <br />AT WALNUT PUMPING STATION <br />(SPEC. NO. 04-057) <br /> <br />APPROVED <br />0 As Recommended <br />0 As Amended <br />0 Ordinance on 1 st Reading <br />0 Ordinance on 2nd Reading <br />0 Implementing Resolution <br />0 Set Public Hearing For <br /> <br /> <br />CONTINUED TO <br /> <br />FILE NUMBER <br /> <br />RECOMMENDED ACTION <br /> <br />Award a contract to Leed Electric, Inc. to upgrade the motor control <br />center at the Walnut Pumping Station in the amount of $259,170. <br /> <br />8 DISCUSSION <br /> <br />The Public Works Agency's Water Resources Division uses a variable <br />frequency drive to regulate the quantity of water pumped from most of <br />the City's wells and pump stations. Currently, the Walnut Street pump <br />station does not use a variable frequency drive. Installation of two <br />variable frequency drives will allow the Walnut Street pumps to start <br />smoothly, use less energy and will reduce pressure surging into the <br />water lines. In addition, once the variable frequency drives are <br />installed, the City will qualify for a $32,344 energy saving rebate. <br /> <br />The notice inviting bids was advertised on <br />bids were solicited. A summary of the <br />received is as follows: <br /> <br />April 26 and 28, <br />bid invitations <br /> <br />2004, and <br />and bids <br /> <br />13 Invitations For Bid mailed <br />3 Bids received <br /> <br />Bids were received, opened on June 2, 2004, and evaluated (Exhibit 1). <br />The bid from Leed Electric, Inc. is responsive to the specification. <br /> <br />8 <br /> <br />22D-1 <br /> <br />CS.383 <br />
The URL can be used to link to this page
Your browser does not support the video tag.