Laserfiche WebLink
<br />8 <br /> <br />ABSTRACT OF BIDS <br />CONTRACT AWARD FOR MOTOR <br />CENTER UPGRADE AT WALNUT <br />(SPEC. 04-057) <br /> <br />CONTROL <br />PUMPING STATION <br /> <br />Vendor <br /> <br />Leed <br />Electric, Inc. <br /> <br />Pier <br />Electric <br /> <br />CDM <br />Constructors, Inc. <br /> <br />Location <br /> <br />Norwalk <br /> <br />Alameda <br /> <br />Hesperia <br /> <br /> Labor/ <br /> Materials* $245,612.00 $261,888.00 $263,995.00 <br />8 Price <br /> *Tax @ 7.75% $ 13,558.00 $ 15,005.00 $ 13,185.00 <br /> (materials <br /> only) <br /> Total <br /> Cost $259,170.00 $276,893.00 $277,180.00 <br /> <br />1% Local <br />Vendor <br />Preference <br /> <br />N/A <br /> <br />N/A <br /> <br />N/A <br /> <br />8 <br /> <br />EXHIBIT 1 <br /> <br />22D-3 <br />