Laserfiche WebLink
<br />. <br /> <br />. <br /> <br /> Estimated Entity Funded Priur <br />Description of Improvement Cost (2004 Responsible to Indicated <br />For Triggering <br /> Dollars) Imwovemellt _EvenC(Cash) <br />6. Restripe: (1) WB Santa Clara to provide $50,000 Owner Building <br />one LT lane and one shared LT/RT lane; Pennit <br />(2) NB Grand Avenue from Fruit Street to <br />14th Street at Santa Ana Blvd/I-5 HOY <br />ramps to provide three NB travellanes; (3) <br />1-5 NB off-ramps to provide a WB LT lane, <br />a shared L T /R T lane and aRT lane at <br />Grand Ave. <br />7. Remove existing on-street parking sta11s $300,000 Owner Building <br />and parking meters on Main Street trom Pennit <br />Civic Center Dr. to Buffalo St., restripe and <br />sluITY seal this Main Street segment to <br />provide three NB and two SB travel lanes, <br />and construct median on Main S1. south of <br />10th Street. <br />8. Acquire necessary ROWand construct $6,500,000 Owner, Final Map <br />southbound RT lane at Main/I ih and unless City <br />Broadwayll ih, including striping, traffic undertakes per <br />signal modification, and ADA compliant section 5.1.1 <br />wheel chair ramps. <br />9. Implement neighborhood traffic plans to $1,200,000 City Building <br />mitigate changes in traffic patterns or (actual cost, Pcnnit <br />increased cut through traffic resulting from not an <br />the One Broadway Plaza Project in French estimate) <br />Park, French Court, Wi11ard, Floral Park, <br />West Floral Park, and Washington Square <br />Ncighborhoods. Traffic plans costs sha11 <br />include tratlic studies, stafftime to process <br />neighborhood traffic plan, and the <br />construcÜon of appropriate semi-diverters, <br />diaçronal diverters and street closures. <br /> <br />. <br />