My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75E - ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/06/2004
>
75E - ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:02:08 PM
Creation date
7/2/2004 3:14:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75E
Date
7/6/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EIR No. 99-01, <br />GPA No. 04-01, <br />DA No. 2004-01 <br />July 6, 2004 <br />Page 4 <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />AA No. 04-01, <br />ZOA No. 04-02, <br />and TPM No. 2004-02 <br /> <br />Requiring the developer to submit evidence, for the provision of the <br />payment of "Prevailing" and/or "Area Standard Wages" as appropriate, <br />that it has entered into a labor agreement with the Los Angeles and <br />Orange Counties Building and Construction Trades Council. Said <br />agreement shall also include provisions that encourage the referral <br />and utilization, to the extent permitted by law, of qualified <br />residents as journeymen, apprentices and trainees. An executed copy <br />of the agreement shall be submitted to the City prior to the issuance <br />of building permits; <br /> <br />Prohibiting the developer to request or accept any agreement with the <br />Santa Ana Community Redevelopment Agency for economic, debt service <br />payments, or other assistance for the development of the Project; <br /> <br />A provision that all offsite mitigation measures identified in the <br />entitlements shall be specifically listed and incorporated into the <br />Agreement (the "Project Mitigation Measures"). Developer shall <br />deposit cash, security in a form acceptable to the City's Executive <br />Director of Public Works Agency, or other reasonably acceptable proof <br />of ability to perform to pay for the Project Mitigation Measures <br />(including traffic studies) at the time called for in the <br />entitlement, and in any event, prior to the issuance of building <br />permits. Any deposit shall be supplemented to cover the actual costs <br />incurred. The Public Works Agency shall provide to the Developer an <br />estimate of the Project Mitigation Measures which shall include land <br />acquisition and construction costs pertaining to the public <br />improvements required of the Project; <br /> <br />5. <br /> <br />Defining and requiring core construction costs of the Project shall <br />not be less than the RS Means "Medium" square footage estimate, <br />including the installation cost of all mechanical and electrical <br />equipment for a Class A high rise office building; <br /> <br />6. <br /> <br />Requiring the drop off/pick up area for Orange County High School of <br />the Arts (OCHSA) be approved by the City Engineer and implemented <br />before any demolition or construction is initiated for the Project; <br /> <br />7. <br /> <br />Relocating the historic structure located at 1015 North Broadway <br />(Twist-Basler House) to Cabrillo Park at the sole expense of the <br />Developer. Additionally, the structure shall be set upon a new <br />foundation, supplied with all necessary utilities and shall be <br />rehabilitated to City standards. The cost of rehabilitation shall <br />serve as a credit against the Developer's Art and Culture fee <br />obligation; and <br /> <br />75E-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.