My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - CELLULAR ANTENNA ADAMS PK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/06/2004
>
25K - CELLULAR ANTENNA ADAMS PK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:02:00 PM
Creation date
7/2/2004 5:18:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25K
Date
7/6/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RFCA <br />July <br />Page <br /> <br />- Lease <br />6, 2004 <br />2 <br /> <br />Agreement with Sprint PCS <br /> <br />6. Cellular frequency <br />communication. <br /> <br />shall <br /> <br />not <br /> <br />interfere <br /> <br />with <br /> <br />the <br /> <br />City's <br /> <br />radio <br /> <br />The Sprint lease is for a period of ten years with three five-year <br />options. Sprint will install a 65-foot monopine pole that will be <br />designed for collocation, north of the playground area. The antennas will <br />be located at 40 feet above existing grade to allow sufficient room for <br />another carrier. The antenna will be painted to blend in with the <br />monopine. <br /> <br />The Sprint equipment facility will also be located on the north side of <br />the playground. The equipment facility will be designed as a park <br />shel ter along with a park picnic she I ter. Sprint agreed to remove the <br />existing picnic shelter and replace it with a new shelter. The facility <br />will be made of concrete block, concrete support columns and a metal <br />standing seam metal roof. Sprint will install their own electrical <br />service and pay for all electricity used by their operation. <br /> <br />Sprint has agreed to pay the City $24,000 per year, with an annual rent <br />increase of three percent each year, for lease of the park space. Because <br />the installation of the equipment is estimated to be completed by <br />January, only $12,000 in revenue is anticipated for fiscal year 2004-05. <br />Upon termination of the lease Sprint will restore the site back to its <br />original condition at no cost to the City. In addition, Sprint will <br />maintain general liability insurance naming the City as additional <br />insured in the amount of $1,000,000 throughout the term of the lease. <br /> <br />ENVIRONMENTAL IMPACT <br /> <br />In accordance with the California Environmental Quality <br />recommended action is exempt from further review. Categorical <br />Environmental Review No. 2004-75 will be filed for this project. <br /> <br />Act, the <br />Exemption <br /> <br />FISCAL IMPACT <br /> <br />Funds are available in the Capital <br />(account no. 051-250-6631). <br /> <br /> <br />~ <br /> <br /> <br />Executive Director <br />Parks, Recreation and Com. Svcs. <br /> <br />Outlay Fund for Park Improvements <br /> <br /> <br /> <br />ND ACCOUNT: <br /> <br />APPROVED AS <br /> <br />¡t. ,~ <br />Rod R. Coloma <br />Executive Director <br />Finance & Management <br /> <br />Svcs. Agency <br /> <br />25K-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.