My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75F - ONE BROADWAY PLAZA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/19/2004
>
75F - ONE BROADWAY PLAZA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 5:01:54 PM
Creation date
7/15/2004 11:29:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75F
Date
7/19/2004
Destruction Year
2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />One Broadway Plaza <br />Environmental Impact Report <br /> <br />Findings and Facts in Support of Findings <br /> <br />road hauling. This measure is already included in the particulate emission projections in <br />the report. Haul trucks leaving the site shall also have a minimum freeboard distance of <br />12 tt, or cover payloads. <br /> <br />AQ-4 Sweep streets if silt is carried over to adjacent public thoroughfares. <br /> <br />AQ-5 Reduce traffic speeds on all unpaved road surfaces to 15 miles per hour or less. <br /> <br />AQ-6 Suspend grading operations during first and second stage smog alerts. <br /> <br />AQ-7 Suspend all grading opèrations when wind speeds (as instantaneous gusts) exceed 25 <br />miles per hour. <br /> <br />Maintain construction equipment engines by keeping them tuned. <br /> <br />AQ-8 <br />AQ-9 <br /> <br />Where feasible use low sulfur fuel for stationary construction equipment. <br /> <br />AQ-I0 Where feasible utilize existing power sources (e.g., power poles) or clean fuel <br />generators rather than temporary power generators. <br /> <br />AQ-l1 Provide on-site power sources during the early stages of the project. <br /> <br />AQ-12 Where feasible, use low emission on-site stationary equipment (e.g. clean fuels). <br /> <br />AQ-13 Spread soil binders on site, unpaved roads and parking areas. <br /> <br />AQ-14 Apply chemical soil stabilizers according to manufacturer's specifications to all inactive <br />construction areas (previously graded areas which remain inactive for 96 hours). <br /> <br />AQ-15 Reestablish groundcovers on construction site through seeding and watering of the site <br />that will not be disturbed for lengthy periods (such as two months or more). <br /> <br />4.1.1.4 Level of Significance of Impacts Related to Construction NO! and PMIO Emissions <br /> <br />The short term adverse impacts of the One Broadway Plaza project related to NOx and PMIO <br />emissions during construction cannot be mitigated to below a level of significance. <br /> <br />4.1.2 Impacts Related to Long Term Air Quality Impacts <br /> <br />4.1.2.1 Potentially Significant Adverse Impact Related to Long Term NO! Emissions <br /> <br />As described in detail in Section 3.4 (Air Quality) in the EIR, the One Broadway Plaza project <br />will result in adverse air quality impacts related to NOx emissions during long term operations. <br /> <br />4.1.2.2 Finding Related to Long Term NO! Emissions <br /> <br />U/vfregoso/wp51/reports/One Broadway final findings <br />June 28, 2004 <br /> <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.