Laserfiche WebLink
<br />One Broadway Plaza <br />Environmental Impact Report <br /> <br />Findings and Facts in Support of Findings <br /> <br />8 <br /> <br />associated with their implementation. <br />mitigation measure T - 7 is required. <br /> <br />To help mInimiZe impacts along Broadway Street, <br /> <br />T-7 <br /> <br />The developer shall pay all costs (acquisition, design, construction, administration and <br />inspection) for providing southbound right-turn lane at the intersection of Broadway <br />Street and 1 ih Street. <br /> <br />Impacts to Intersections <br /> <br />Main Street & 1 ih Street. Miti~ation measures to reduce potential traffic impacts at the <br />intersection of Main Street and 17t Street to a level considered less than significant have been <br />determined to be not feasible due to significant land use impacts associated with their <br />implementation. To help minimize impacts at the intersection, mitigation measures T -4, T -5 and <br />T-6 are required. Mitigation measures T5 and T6 were provided earlier. Mitigation measure T4 <br />is provided below. <br /> <br />T-4 <br /> <br />Main Street, between 1 ih Street and the 1-5 ramps, shall have all on-street parking <br />stalls and parking meters removed, and Main Street shall be restriped to provide three <br />northbound and two southbound travel lanes. The project proponent shall pay all costs <br />(design, construction, administration and inspection) associated with these removals <br />and re-striping when building permits are issued. <br /> <br />8 <br /> <br />Broadway & 1 ih Street. Mitigation measures to reduce potential traffic impacts at the <br />intersection of Broadway Street and 17th Street to a level considered less than significant have <br />been determined to be not feasible due to significant adverse land use impacts associated with <br />their implementation. To help minimize impacts at the intersection, mitigation measure T -7, <br />provided earlier, is required. <br /> <br />Main Street & W ashington Avenue. Mitigation measures to reduce potential traffic impacts at <br />the intersection of Main Street and W ashington Avenue to a level considered less than significant <br />have been determined to be not feasible due to significant adverse land use impacts associated <br />with their implementation. To help minimize impacts at the intersection, mitigation measure T-1 <br />is required. <br /> <br />T-1 <br /> <br />The developer shall pay all costs (design, construction, administration and inspection) <br />for Washington Avenue and 10th Street to operate as one-way streets which include <br />signal modifications and appropriate protected left-turn signal at Main <br />Street/Washington Avenue, Main Street/lOt Street, Washington Avenue/Sycamore <br />Street, Broadway Street/Washington Avenue and Broadway Street/10th Street. <br /> <br />Broadway Street & 4th Street. Mitigation measures to reduce potential traffic impacts at the <br />intersection of Broadway Street and 4th Street to a level considered less than significant have <br />been determined to be not feasible due to significant adverse land use impacts associated with <br />their implementation. No mitigation is proposed. <br /> <br />8 <br /> <br />1 st Street and Flower Street. Mitigation measures to reduce potential traffic impacts at the <br />intersection of 1 st Street and Flower Street to a level considered less than significant have been <br /> <br />Resolution No. 2004-020 <br />Page 37 of 73 <br />